We are going to commission our interior space to get certify with LEED-CI. My query is that owner has designed VAV boxes in tenant space to control manually and base building developer has provided VFDs in AHU to control air based on the return air temperature of AHU. So there is no static pressure control also base building developer can control VFDs by BMS system. I want to know with can be meet requirements of USGBC and complete our commissioning. Because in our interior space we have manual control only.