We are going to commission our interior space to get certify with LEED-CI. My query is that owner has designed VAV boxes in tenant space to control manually and base building developer has provided VFDs in AHU to control air based on the return air temperature of AHU. So there is no static pressure control also base building developer can control VFDs by BMS system. I want to know with can be meet requirements of USGBC and complete our commissioning. Because in our interior space we have manual control only.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11477 thumbs up
November 19, 2011 - 11:24 pm
Monu, I may be missing something but I am not sure what the question is in terms of commissioning. At least in terms of this credit, I think you simply need to commission the system you have—whatever it is.