Forum quick links
Male vs. Female FTE
posted by Jennifer Berthelot-Jelovic on
I am trying to complete PI FORM 3: OCCUPANT AND USAGE DATA. However, I cannot seem to find the location to enter the male to female ratio.
weather data
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
i m using HAP 4.41 for HVAC load calculation and energy modeling but unfortunatly the weather data available is hourly average s it ok to use for leed energy simulation or i ahve to go to another f
Request for Info re CI and 60% Gross Floor Area Calculation
posted by Raymond Loo on
I am not too clear on the definition of Gross Floor Area and how is the calculation carried out with respect to the CI requirement of alteration to at least 60% of the gross floor area. I thought
Definition of View
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by SUNG SU KIM on
In our builing, some regulary occupied spaces are located in B1~B2. To earn this credit 8.2, we decided to make sunken beside B1~B2 wall.
Test method
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Paola Figueiredo, Newton Figueiredo on
Can a flooring system be tested using the latest version of CDPH test method and still comply to NC 2009? NC 2009, option 2, demands that all flooring products meet the testing requirements of Cal
IEQc8.1 Daylighting Spreadsheet Calculator
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Molly Jones on
We are working on a project using the May 2011 version of the daylighting and views spreadsheet. We are using excel 2007 with macros enabled.
City Supplied Reclaimed Water
EBOM-2009 WEc3:Water Efficient Landscapingposted by Nicholas Bradley on
My project site is already utilizing reclaimed water for 100% of it's irrigation, as required by the local city ordinance. Are we still eligible for this credit?
Pre-rinse spray valves
CS-2009 WEp1:Water Use Reductionposted by Tapio Peltonen on
LEED-CS 2009 form WEp1 version 4.0 states the following: "Note: The flow rate for all pre-rinse spray valves must be less than or equal to 1.6 gpm.
Applicability of ASHRAE62.1 in Major Renovation
CS-2009 IEQp1:Minimum IAQ Performanceposted by Jens Apel on
Dear all, This covers more than just ventilation but as this is the most important I put all facts and questions down here. An existing building from the 1970s is undergoing construction works.
Projected Biomass Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by Jose Salinas on
Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust.