Forum quick links
LEED AP O+M
EBOM-v4.1 INc1:Innovationposted by Hatice G. on
Hello,
is it also a prerequisite to have a LEED AP O+M for a recertification project via Arcskoru?
Naturally Ventilated Warehouse
CS-v4 EQp1:Minimum indoor air quality performanceposted by Micaela Smulevich on
We are currently working on incorporating sufficient strategies to naturally ventilate an industrial warehouse.
partially heated space
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In the building I am modelling there is a big warehouse that is heated partially only (where the workers are more active, i.e. close to the loading bays).
Define available buildable space
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Cindy Cordo on
In BD+C-v4.1 LTc4, Option 1, Table 1a, in calculating the FAR for nonresidential uses, does on-site parking need to be included in the overall available acreage of the available building space
Warehouse renovation: insulation required per ASHRAE 90.1-2010?
NC-v4 EAp2:Minimum energy performanceposted by Alessandro Zuanon on
Dear all,
Surface Reflectivity calculations for walls with glazing
NC-v4.1 EQc6:Interior Lightingposted by Ricardo Sá on
Dear All,
Survey on Equitable Design Practice
posted by Mike Fowler on
Mithun has a part-time employee Jake Minden who is a graduate student at the University of Washington.
MR Pilot #87 - Verified Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Michelle Rosenberger on
My project is located in a fairly remote region that ironically is proximate to one of the few verified recycling rate facilities in my region, so we were lucky to be able to pursue this credit.
Baseline System type and size
CI-v4 EAp2:Minimum energy performanceposted by Tzung-Han Ho on
Hi all,