Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to model multiple buildings served by a common chiller plant?

NC-v4 EAp2:Minimum energy performance
posted by  Raheel Mujtaba  on 

There are multiple blocks undergoing the LEEDv4 campus certification on a site.

1
Thu Sep 26, 2024, 3:53 pm

Connected Functionality Criteria

NC-v4.1 LTc8:Electric Vehicles
posted by  Rebecca Hatchadorian  on 

Can anyone give me a better understanding of the "Connected Functionality Criteria" requirement?

2
Sustainability Lead
Parkhill
LEEDuser Basic Member
11 thumbs up
Thu Sep 19, 2024, 4:43 pm
7
Sustainability Director
Absher Construction
LEEDuser Basic Member
1 thumbs up
Thu Sep 19, 2024, 1:37 pm

REACH Optimization

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Sandra Moran  on 

Project is N America (outside USA). Manufacturer is Europe HQ with global operations; uses European standards for global manufacturing.

7
Advocate
EcoAdvisor Group LLC
LEEDuser Basic Member
0 thumbs up
Thu Sep 19, 2024, 9:33 am
2
Thu Sep 19, 2024, 2:42 am

Building reuse plus addition

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Erica Downs  on 

Can someone please clarify if the entire project (including additions) is used as the "denominator" for this credit?  Or only the existing building that is being resused?  I am finding th

4
Sustainability Director
Ayers Saint Gross
LEEDuser Basic Member
5 thumbs up
Wed Sep 18, 2024, 8:31 pm

Reheating more than 30% at the VAV

NC-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

I am becoming involved with a project that is being designed to reheat more than 30% of the max cooling airflow rate at the VAV box. 

2
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Wed Sep 18, 2024, 3:28 pm

Laboratory Spaces baseline system in warm climate and proposed building is electrified heating

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Russell Knudson  on 

For a project within warm Climate Zones 0 to 3A, and that has a "metal shop" space that requires more than 15,000 CFM, is it a correct reading that the baseline system serving those spaces shall ei

1
Thu Sep 26, 2024, 3:51 pm

Clubhouse Building Type? Public Assembly or Non-Residential?

NC-v4.1 EAc2:Optimize Energy Performance
posted by  Junaid Mujahid  on 

A clubhouse project with amenities including: Gymnasium, Yoga/Aerobic Studios, Party Hall, Dining Hall, Lounge, Small Retail Stores, Prayer Rooms, Basement Parking should be categorised under which

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 18, 2024, 8:00 am