Changes to Recognition Package
posted by Erin Emery Hartz on
Hello Brian, Prior to this change, there was one policy for LEED 2009 projects and another for everyone else, despite project fees remaining the same. This change eliminates that discrepancy.
Open Space Requirement
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Elliot Powers, LEED AP BD+C on
Count me in with those frustrated with this credit language/ requirements.
No irrigation at all
CS-2009 WEc1:Water Efficient Landscapingposted by Yanina Ibañez on
Hello, in my project there will be no irrigation at all because of the adapted plants plant in all the green roofs. How do we demonstrate the achievement of the credit?
POLYETHYLENE TEREPHTHALATE (PET)
Pilot-Credits PC11:Chemical Avoidance in Building Materialsposted by Julie Hendricks on
I'm thinking of submitting for this pilot credit with one of my products being a type 6,6 Interface carpet tile (Tectonics).
design phase denial
posted by Keelan Kaiser on
When submitting for a split review what are the options when a credit has been tagged as denied? Can the credit be re-reviewed during construction phase?
multiple-point credit changes between design and construction
posted by Keelan Kaiser on
What happens, hypothetically, when a EAc1 or EAc2 point calculation changes between the time a design credit is marked "anticipated" by the reviewer and the time final construction phase reporting
appeal alternatives when the reviewer makes a mistake
posted by Keelan Kaiser on
OK, reviewers probably don't make mistakes, but what can be done in situations where a denial has been issued, but the design team believes that there is an error in the clarification review and th
Denied Credits in Precertification Review
posted by Daniela Castro Salgado on
Could anyone tell me if an ID credit is denied during the Precertification Phase, can it be changed for the Design Review without having to Appeal?