Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Retail FTEFull-time

CS-2009 WEp1:Water Use Reduction
posted by  James Wieben  on 

Retail FTE is for 8 hour shifts, so if the business has 12 hours open to the public do I use a value of 1.5 x the FTE value to arrive at a value to use when defining the usage of the plumbing fixtu

1
Sun Nov 25, 2012, 12:38 am

LEED for Home Multi-Family

Pilot-Credits PC38:Advanced Utility Tracking
posted by  Nate Gapinski  on 

Has anyone ever certified a multi-family construction project? Just wanted to see how the process was and if we are on top of everything.

1
Sun Nov 11, 2012, 7:02 pm

Accessibility for Seniors

Pilot-Credits PC34:Design for Adaptability
posted by  Lance Hillegas  on 

Our project is an age and income restricted apartment building for low income seniors.

0

Which rating system to use.

LEED Rating System Selection
posted by  Sheryl Swartzle  on 

We are working on a large airport project. West terminal is registered in LEED NC v2.2 (construction not started as of yet).

1
Fri Nov 23, 2012, 3:26 pm

Outdoor Air Intake: Baseline vs. Proposed

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

We are currently working on a LEED project whose Baseline Building will have an HVAC system 5 installed.

1
Mon Nov 12, 2012, 2:46 pm

Distance between bicycle storage and building entrance

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Patricia Missawa  on 

According to LEED Commercial Interiors SSc3.2 - Alternative Transportation: Bicycle storage and changing rooms template, if a bicycle storage is located within the building, the distance must be co

1
Tue Nov 20, 2012, 1:58 am

To meter or not to meter

CI-2009 EAc3:Measurement and Verification
posted by  Rudolph Carneiro  on 

I have a store (case 1) with a small 60 ton chiller, 2 AHU's, lighting, and plug loads. If HVAC, plug loads, and lighting can be measured on one meter, how many meters do I need?

1
Mon Nov 26, 2012, 4:45 pm

Energy Use from EAp2 / EAc1

NC-2009 EAc6:Green power
posted by  Michele Helou  on 

We have already had our EAp2/EAc1 energy model credits reviewed and approved. In an effort to achieve a higher LEED rating, the owner has opted to purchase REC's.

1
Mon Nov 12, 2012, 7:08 pm

FTE calculation using CS appendix 1 for NC project

Calculating FTEs
posted by  J.W. Shin  on 

I'm on the hotel NC project and we are under discussion that how to determine FTE number. If there is no certain number of FTE, can we use CS appendix 1 to determine FTE?

1
Thu Nov 22, 2012, 1:17 am

Flow rate for Kitchen Sink

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  ABHIJIT PISAL  on 

I just want to understand at what pressure is flow rate of kitchen sink (2.2 GPM) defined

1
Fri Nov 23, 2012, 3:59 pm