Forum quick links
SHGC vs U-factor
CS-2009 EAc1:Optimize Energy Performanceposted by Alex AC on
Hi everybody! I´m looking at several glass options for a building project and I want to make sure I pick the most cost-effective and energy efficient options available to me.
LEED paperwork for EAp2: Seciton 1.2 - Space Summary
NC-2009 EAp2:Minimum Energy Performanceposted by Doug Cooper on
Does the LEED online form want me to list each space room by room, or are a few overall general space types okay?
Ceiling credit
CI-2009 IDc1:Innovation in Designposted by Tarek on
now we are working on project Commercial interior in Egypt ,As you know that there is no credit related to ceiling , 80% of building was used the false ceiling and this ceiling was Meets CA Dept.
CX EBOM EAc2.1
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Katherine Phelps on
Looking for a Building commissioning service provider in Southern Massachusetts.
Contract service use of equipment
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Kay Sieck on
Do I need to get a list of the powered equipment used by our contract service that is used on site for landscape management such as lawn mowers and leaf blowers?
Building recessed into hill/mountain
NC-2009 EAc1:Optimize Energy Performanceposted by Anoop Vijay on
Hi, I have a query related to baseline modeling for a hotel project in oman. This hotel is built on a hillside with the building recessed into the hill completely on one side.
SS3, No LEED approved pesticides available here
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Ruba Al-Foraih on
I am working on certifying an existing building in a country where non the pesticides approved by LEED are available.
University electric vehicle research facility
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Studio 804 on
We are completing a 3,000 SF project for an on-campus group that takes production vehicles and retrofits them to be completely battery electric.
Adjacent Construction Work
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ralf Lehmann on
Parts of our site are temporary used for construction work for a future adjacent building.
Filtration Media Documentation Table
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Greengrade User on
The table in the form asks for the Location of th AHU, not the location that the temporary filter is installed.