interview with Sarah Alexander posted

General forums
posted by  Tristan Roberts  on 

Hi, Sarah and her staff have responded to the questions posted here as well as questions emailed directly to me. See above, and please post your follow-up comments.

0

Exterior Lighting special circumstances

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Luis Miguel Diazgranados  on 

Hello Everyone: First of all, I have read previous posts, and I have seen that this subject has already been discussed, but the way I see it, in this case it might be a special circumstance. We a

0

Different showers in Wellness / Fitness Center

CS-2009 WEp1:Water Use Reduction
posted by  Ralf Lehmann  on 

Within a typical fitness center including a sauna there are different types of showers. 1.

0

Standard flush fixtures automatically gives credit in my county

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Maria Porter  on 

I just wanted to hear thoughts about the fact that our standard flush fixtures reduce water usage by 56 %, without us doing anything.

1
Wed Feb 6, 2013, 9:55 am

Safe pedestrian access to the building please!

Pilot-Credits PC14:Walkable Streets
posted by  Maria Porter  on 

I would like to see this credit evolve to include pedestrian access to the building. Most cities in my country are very pedestrian oriented and can comply with this credit´s requirements.

1
Fri Jun 1, 2012, 11:18 pm

Daylight simulation for office building

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Lucie Cervena  on 

LEED reference guide said that in Option 1 compliance should be demonstrated through computer simulation of all regularly occupied spaces.

1
Thu May 31, 2012, 1:35 pm

Urinals are not everywhere

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Tatjana Ernst  on 

Hi Everyone, we have a building which has 37 dual flush for men and 8 Urinals, the Urinals are not in every toilet room (for example there are no urinals in the basement), there will be only one

1
Thu May 31, 2012, 1:06 pm

PIF#4: Project floor plans and sensitive information

General forums
posted by  Gail Vittori  on 

Has anyone had experience working on a project where floor plans contain sensitive information and the owner has requested certain details be redacted for security reasons?

1
Thu Jun 7, 2012, 1:06 am

Proposed Building Envelope Assembly Thermal Properties

CS-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

How do I calculate the U-factor for the construction assembly (e.g walls) according to ASHRAE 90.1-2007 Appendix A if one or some of the construction layers properties are not specified in the ment

1
Thu May 31, 2012, 6:50 pm

New Bus Routes, not yet operational

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Douglas Ross  on 

In the Design Submittal, I uploaded a letter from the local transit authority that two bus routes were planned and funded; however, they were not operational because the employees had not moved to

1
Tue Jun 12, 2012, 11:27 pm