Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Boundary and equipment

CS-2009 EAp2:Minimum Energy Performance
posted by  Gabriela Hernández Castillo  on 

We have a mixed use project with several buildings on it, from which one of them will apply for LEED-CS certification.

2
Tue Apr 12, 2011, 10:16 pm

Occupancy Sensors

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Lindsay Duncan  on 

In the past GBCI has stated as a side note: "For future projects, please note that occupancy sensors alone are not an acceptable form of lighting control".

3
Default Avatar
Vice President
Thornton Tomasetti
LEEDuser Premium Member
188 thumbs up
Tue Apr 12, 2011, 8:06 pm

Existing classrooms on an addition

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Joe Piedimonte  on 

We have a project that is an addition to an existing school. The existing classrooms are included in the LEED boundary, but they have only had minor updates of mechanical systems.

2
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Tue Apr 12, 2011, 4:57 pm

ESCO Performance Contract

posted by  Lauren Ford  on 
3
Default Avatar
Environmental and Sustainability Manager
Energy Management Services, Int.
LEEDuser Basic Member
41 thumbs up
Tue Apr 12, 2011, 8:53 am

Warehouse - Heating Only

NC-2009 EAc1:Optimize Energy Performance
posted by  Curt Pascoe  on 

There has been much talk that warehouses with heating-only (no cooling) must still model a cooling system in the baseline and proposed case, since the space is defined as conditioned.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 11, 2011, 2:35 pm

Case 2 Calculators

posted by  Walter Kanzler  on 
2
Mon Apr 11, 2011, 10:31 am

Performance Period

posted by  Paul C  on 
4
Default Avatar
Optimized Energy
LEEDuser Basic Member
9 thumbs up
Fri Apr 8, 2011, 4:09 pm

Regularly Occupied Spaces

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Anya Rose Benkabbou  on 

We are stuggling to define "regularly occupied space".

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Apr 6, 2011, 10:34 pm
5
Default Avatar
Project Designer
Risinger + Associates
LEEDuser Basic Member
39 thumbs up
Wed Apr 6, 2011, 8:47 pm

Option D: Baseline Model

posted by  Maya Karkour  on 
3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Wed Apr 6, 2011, 1:07 pm