Forum quick links
Is there an Innovation Opportunity?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Brian Salazar on
Hello! I am working on a project that already includes all of the required spaces for this credit under Option 1. The building owner now wants to install solar canopies over some of the parking.
Lighting power for apartments
NC-2009 EAp2:Minimum Energy Performanceposted by Ritwik Kakati on
We are working on a multifamily residential building where lighting fixtures are only specified for bathrooms, kitchens & hallways while the bedrooms and living/dining rooms are supposed to hav
Pulverized gypsum as landfill cap?
NC-2009 MRc2:Construction Waste Managementposted by Allison Rutter on
Hi, I'll be submitting a CIR on this, but does anyone have any guidance on redirecting drywall to be pulverized and used as a cap on a landfill closure?
How to calculate effective operable area for top hung window
NC-2009 IEQp1:Minimum IAQ Performanceposted by SSN Energy Model on
Hi, We are in the initial design of an office building. The Project team has planned to provide top hung window & the building will have more naturally ventilated spaces.
iEQpr1 Operable awning windows for natural ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by LEED Pro Consultant on
Hello, We have a building that is naturally ventilated and to comply with ASHRAE 62.1-2007 (prerrequisite) we are planning to place operable windows.
FSC High Pressure Laminates
NC-2009 MRc7:Certified Woodposted by Michele Helou on
I see that Wilsonart is advertising FSC Mix high pressure laminates. I realize paper is not wood, but bamboo is not wood either.
Extra PV, how to get credit?
CI-2009 SSc1:Site Selectionposted by Keelan Kaiser on
We have a unique situation where we have an owner who wants to install a lot of pv on their project. SSc1 is already filled up with the max 5 points.
Radiance and Ecotect
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Lilian Martins on
Is it mandatory to run the model on Radiance when the model has been built up on Ecotect? I have been facing issues on installing Radiance because of my computer windowns version.
Cost of LEED report - Internationl projects
posted by Maya Karkour on
Equipment Eligibility
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Elizabeth Felder on
Hello, would an escalator cleaner apply to this credit? The brushes are motor-powered. Thanks!