Forum quick links
Air Testing: Particulate Matter
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Daniel Smith on
Hi all,
I'm having difficulty understanding what Concentration Limit to apply for Particulate Matter (PM10 and PM2.5) under V4.1 BD+C.
Storage of Chemicals to avoid Cross-contamination in Labs
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Joyce Kelly on
I'm recommending that chemicals delivered to Labs should be stored in vented Chem. cabinets with 0.5cfm psf to create neg. pressure with respect to the rest of the Lab.
Copy/Printing Room - Client against adding a door
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Edgar Arevalo on
I am working on a CI project where the client is against putting a self-closing door (or any door for that matter) to the copy/printing room inside the project space. Typically, I have ran in
Percentage of occupancy for the Indoor Water Use Reduction Calculator for the prerequisite- project only has ADA restrooms.
CI-v4 WEp1:Indoor water use reductionposted by Laura Castro Montoya on
Currently, I am conducting certification for an office project, in the commercial interiors mode, which only has ADA restrooms within the LEED boundary.
Credit numbers
posted by Michelle Robinson Schwarting on
For the 94% of the world that do not have English as their native language, the LEED consultants typically translate the LEED scorecard into their native language. When developers work with d
General v5 Suggestions
posted by Dave Hubka on
1. It is my opinion that sustainability should never be a secret. Please offer the public the same training/resources that are provided to GBCI and external reviewers.
First public comment draft of LEED v5 BD+C/ID+C: Overall and Appendix
posted by Nadav Malin on
Share your comments on the first public comment draft of LEED v5 BD+C/ID+C: Overall and Appendix section on this forum.
Air Intake Minimum Separation Distance - distributed mechanical ventilation system
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Emanuele Contaldo on
Hi,
I am supporting the design of a large students house, more than 700 hundresds rooms.
Can WDC Option 1 be used on a CS Project?
CS-v4 LTc4:Surrounding density and diverse usesposted by Laura Long on
We are working on a core & shell project that is being designed as a 285,000 SF warehouse distribution center. Can the WDC Option 1 in LTc4 be used on a core and shell project? This
Glare-control: buildings with skylight
CS-v4.1 EQc4:Daylightposted by Daniela Corcuera on
Hello!
I am analysing a warehouse building where the daylight is through skylight in a high ceiling.