Tue Aug 11, 2015, 2:23 pm

Double the Pleasure???

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Molly Jones  on 

So...if we participate in this pilot credit (option 1) AND we already comply with LEED-NC 2009 WEc2, is it safe to assume that we will be awarded 2 points under the LEED-NC 2009 WEc2 AND 1 ID point

6
Default Avatar
APM
SBS, EllisDon
LEEDuser Basic Member
2 thumbs up
Mon Aug 10, 2015, 10:12 pm

LEED GA v4 exam

General forums
posted by  Monica Pinjani  on 

Hi Everyone I intent to take the Green GA exam this October. Was initially planning to take the 2009 format exam but due to personal reasons couldn't take it before June 15.

6
Mon Aug 10, 2015, 2:15 pm

FTE in a healthcare outpatient facility

NC-2009 PIf3:Occupant and Usage Data
posted by  Elise LaPaglia  on 

I am working on a LEED-NC project that is primarily an outpatient facility but has some future shell spaces for Retail and some for future expansion of the outpatient facilities.

3
Default Avatar
SENIOR PROJECT DESIGNER
GKKWORKS
LEEDuser Basic Member
0 thumbs up
Fri Aug 7, 2015, 9:36 pm

Pilot credits

EBOM-v4 INc1:Innovation
posted by  Charalampos Giannikopoulos  on 

Is there any particular reason for which a Pilot credit from the general EBOM rating system such as the "Design for active occupants" credit would not be accepted for LEED v4 O+M - Data Centers?

3
Fri Aug 7, 2015, 3:42 pm

EnergyPro for Whole Building Energy Simulation

NC-2009 EAp2:Minimum Energy Performance
posted by  Logan Dorrell  on 

We have a project in which they are attempting to use EnergyPro to show compliance for credits EAp2 and EAc1.

3
Fri Aug 7, 2015, 3:42 pm

Can FSC Product Certification replace invoices?

CI-2009 MRc7:Certified Wood
posted by  Mauricio Ramirez  on 

Hello. I'm pursuing this credit on a project in Mexico City.

2
LEED AP BD+C
SINERGI Integrated Building Sciences, LLC
LEEDuser Basic Member
0 thumbs up
Fri Aug 7, 2015, 3:30 pm

To what extent we provide Tenant fitout

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Indochine Engineering VN  on 

Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Aug 7, 2015, 2:10 pm

How to document a non-LEED-certifiable building?

NC-2009 EAp2:Minimum Energy Performance
posted by  Anya Fiechtl  on 

Our project includes a separate non-LEED certifiable building with no regularly occupied space and no FTE, that houses the renewable energy and ground source heat pump systems for the main building

7
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Fri Aug 7, 2015, 1:11 pm

Naturally ventilated open cafeteria

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Magda Aghababyan  on 

Dear all, We have a fully naturally ventilated open cafeteria (No walls, only roof mounted on top of columns) that is occupied only for max about 2 hrs a day during 1hr lunch break and two tea bre

3