Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Hedges and Trees - Habitat?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Raina Tilden  on 

I am working on a project on an urban brownfield site, so we will be restoring habitat.

1
Fri Apr 25, 2014, 4:08 pm

Using Desiccant Dehumidification - What about the Baseline?

NC-2009 EAp2:Minimum Energy Performance
posted by  Mark Benson  on 

In some cases, such as Hospital operating rooms and Ice Rinks, you have to maintain indoor air dewpoint temperaturs lower than 44 F.

1
Tue Apr 8, 2014, 4:37 pm

Exterior lighting part of 25% process load requirement?

NC-2009 EAp2:Minimum Energy Performance
posted by  Catalina Caballero  on 

Can exterior lighting be part of the 25% process load requirement by Ashrae 90.1-2007 when it comes to energy modeling?

1
Tue Apr 8, 2014, 7:09 pm

wetlands?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Erin Holdenried  on 

Would protected wetlands count towards this credit?

1
Fri Apr 25, 2014, 4:18 pm

Acceptable Forms of Universal Notification?

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  American University  on 

We have rat issues on our urban campus and our grounds staff has some concerns about limiting and slowing application of rodent pesticides in exterior use.

0

Acceptable Forms of Universal Notification?

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  American University  on 

We have rat issues on our urban campus and our grounds staff has some concerns about limiting and slowing application of rodent pesticides in exterior use.

1
Fri Apr 18, 2014, 6:21 pm

Modified Prerequisite

CS-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

Hello Markus. We are planing to use LEED-CS Revised points thresholds based in Owner Energy percentage.

1
Tue Apr 8, 2014, 9:55 pm

Contract between the Owner and the CxA

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Mohamed M. Abd Elhameed  on 

For pursuing EAc3, the contract between the owner and the CxA ensuring CxA involvement in post-construction shall be uploaded through LEED Online credit form.

1
Sun Apr 13, 2014, 2:53 pm

number of working days

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Emmanuel Pauwels  on 

We are surveying building occupants which consist of 2 groups. Group A of the building occupants works 5 days per week. Group B has a 6 day workweek.

0

Material SRI

EBOM-2009 SSc7.2:Heat Island Reduction—Roof
posted by  Mohamed Hesham  on 

i'm participating in a LEED ebom project where the construction was completed in 1990 , the roof tiles are white terrazzo tiles but we can't get any data or documentation from the manufacturer , is

1
Wed Dec 10, 2014, 4:39 am