Forum quick links
Floodplain Documentation
ND-v2009 SLLp5:Floodplain avoidanceposted by Bernard Sagaiyaraj on
My project has failed the Stage 1 SLLp5 documentation.The project is in Malaysia and the state water department has no records to substantiate that the site has not been flooded before.
Embedded marine plywood
CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Carmelito Tatlonghari on
The marine plywood we will install will be embedded inside stainless steel, veneer or it will be basically covered with Formica. Can we earn a point under this credit?
EAc2 criteria of the biogas
NC-2009 EAc2:On-Site Renewable Energyposted by Marcello Polverino on
Hello, I need the criteria of biogas outside of United States (Germany). Are ther requirements? Thank you > Marcello
WR p3 and EA p3 Building-Level Monitoring
posted by Timothy Nabholz on
Hey all, I have been doing a review of the 6th Public Comment Draft of v4 for BD+C and noticed something that seems a bit strange to me.
One-Time Potable Water Analysis
Pilot-Credits WEpc17:Cooling tower water useposted by Edward Malesevich on
When the credit requirements ask for a "one-time" potable water analysis to be conducted, what sort of time-frame is required for this to be completed?
Deal with leasing agreement?
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Jorng-ren Chern on
I am working on a residential project and tenant units would be sold without interior. We submitted design review and the review commented requested to provide sales agreement.
DBA for HVAC Background Noise
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Greengrade User on
Is the 40 dba a direct value for the equipment itself, or is it a net value based on a sound path analysis to the space?
CAV - How to meet section 3.1 requirement
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Srimannarayana NCVK on
Hi, For one of my LEED CI project, air distribution is a CAV system. There is a VFD for AHU though. To document EA c 1.3, i need to meet CPG requirement.
Regularly Occupied Space for a Library?
NC-2009 PIf3:Occupant and Usage Dataposted by Carrie Laurendine on
City Library project. LEED Manual seems too vague, and doesn't seem to address the transient nature of users vs full time office staff.