The LEED Credit Form asks for the capacity per charging station. I understand that a Level 2 EVSE provides a full charge in the range of 5 to 8 hours, is the LEED Credit Form asking for the full charge or something else? Our project is located in a mall so we could make some assumptions about the average shoppers charging/shopping time to determine the capacity per station if LEED is not requiring a full charge. Since retails are often open longer than 8 hours, could we make further assumptions about the number total station capacity.
RWDI USA LLC
LEEDuser Premium Member
2 thumbs up