Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Critical Zone Identification

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  sanjay vashishtha  on 

We are doing a project in which building is of office type and is having 75 AHUs and each AHU is serving one specific tenant area, means there are 75 tenant. Each tenant area is almost 10,000 SF.

1
Fri Dec 14, 2012, 7:10 pm

Time for a Boycott?

General forums
posted by  Rob Hink  on 

Hopefully we are all saving our money and not buying USA Today. What would it take start a boycott against this shoddy journalism?

1
Fri Dec 21, 2012, 6:51 pm

EV Charging Station Monitoring

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Studio 804  on 

I was told by a EV Charging Station manufacturer that LEED is revising their standards to require monitoring equipment be included on the units (to track usage, etc). Is this true?

1
Fri Dec 14, 2012, 4:48 pm

City of Fresno's Diversion Rate

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Edward Cornejo  on 

We're currently working on a project in Fresno, where they have a published diversion rate for all waste of 75%. All waste is separated into either standard waste bins or a recycling bin.

1
Wed Feb 6, 2013, 12:06 am

BEMwiki

NC-2009 EAc1:Optimize Energy Performance
posted by  Eddy Santosa  on 

FYI only, I believe this is useful information for LEEDuser community as well.

1
Thu Dec 20, 2012, 11:40 pm

Determining Zone 1 or Zone 2

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Miranda Groth  on 

Maybe I am overlooking this, but I am having difficulty determining the zones for my building.

1
Wed May 22, 2013, 1:26 am

Roof Heat Island Effect Points

LEED for Homes (LEED-H) Forum
posted by  Lindsey Sutton  on 

Does the reflective roofing to reduce the heat island effect qualify with a single family home (3 stories including basement)? I found something that said only 4+ stories multifamily homes.

1
Tue Dec 18, 2012, 2:16 am

Project Registration

Performance Period
posted by  Katherine Ann Resurreccion  on 

Hi All When you register the project, does that mean that the time clock of performance period already starts ticking?

1
Tue Dec 18, 2012, 6:03 am

Requirements of this madatory credit for India based projects

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Kevin Sullivan  on 

I would like to understand how to approach this prerequisite for projects in India and other similar countries where EPA guidelines will not be applicable.

0

Does water count for MRc4 and MRc5

CS-2009 MRc5:Regional Materials
posted by  Anna Korinkova  on 

Does water as a part e.g.

1
Tue Dec 18, 2012, 9:53 pm