Are glulam beams included in credit EQ4.4

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Joanne Sawatzky  on 

We are wondering if glulam beams need to contain no added urea formaldehyde? thanks curtis

1
Fri Dec 7, 2012, 11:07 pm

LEED-CS v2.0

NC-2009 PIf1:Minimum Program Requirements
posted by  Jodie Clarke  on 

I have a project that registered using LEED-CS v2.0 in 2007.

1
Mon Dec 10, 2012, 2:13 pm

Green Vehicles for Warehouse and distribution centers

General forums
posted by  Rob Watson  on 

For warehouse and distribution centers, SSc8 an Option 3 should be introduced such that if a firm has an established logistics optimization system in place that will be implemented at a new facilit

0

What will the fixes be for LEED Online V4?

General forums
posted by  Rob Watson  on 

In order for successful ballot, I believe that it will be imperative for USGBC and GBCI to let users know in a fair amount of detail how they're planning to address the existing shortcomings in the

0

The What vs. The How

General forums
posted by  Rob Watson  on 

I believe that "The What" (credit requirements) is less important to the success of Version 4 in the market compared to “The How." By “the How,” I mean the submittal requirements and the tools f

0

Suggestion for an alternative transition between V3 & V4

General forums
posted by  Rob Watson  on 

What I think would be better for the transition would be to allow an alternative compliance pathway for the materials credits ("Backwards compatibility"-a bit more on this in a separate post) and h

0

leed online v3 user interface

General forums
posted by  sam Alfassy  on 

i can not make the leed online interface show normalyy - all text is alligned to the right side of the screen. I am working with a left to right interface (for hebrew language) i have downgraded my

1
Fri Dec 14, 2012, 5:11 pm

submit to leed-online compliance

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ron Dean  on 

Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I

1
Mon Dec 10, 2012, 4:30 pm

NC Innovation credits from EBOM, design or construction review?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  SmithGroup BG+LU FW  on 

If an ID credit is first submitted during preliminary review for design credits and the reviewer's comments require client input that will take longer than 25 (working) days for us to document can

1
Mon Dec 10, 2012, 8:31 pm

Why aren't all v4 credits and prereq's available for comment?

General forums
posted by  Joseph F. Bridger  on 

I was confused to see that I could not post comments for LEED v4 for all of the credits and prereq's I had assembled comments for. Why are some available and some not?

1
Mon Dec 10, 2012, 7:46 pm