Are glulam beams included in credit EQ4.4
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Joanne Sawatzky on
We are wondering if glulam beams need to contain no added urea formaldehyde? thanks curtis
LEED-CS v2.0
NC-2009 PIf1:Minimum Program Requirementsposted by Jodie Clarke on
I have a project that registered using LEED-CS v2.0 in 2007.
Green Vehicles for Warehouse and distribution centers
posted by Rob Watson on
For warehouse and distribution centers, SSc8 an Option 3 should be introduced such that if a firm has an established logistics optimization system in place that will be implemented at a new facilit
What will the fixes be for LEED Online V4?
posted by Rob Watson on
In order for successful ballot, I believe that it will be imperative for USGBC and GBCI to let users know in a fair amount of detail how they're planning to address the existing shortcomings in the
The What vs. The How
posted by Rob Watson on
I believe that "The What" (credit requirements) is less important to the success of Version 4 in the market compared to “The How." By “the How,” I mean the submittal requirements and the tools f
Suggestion for an alternative transition between V3 & V4
posted by Rob Watson on
What I think would be better for the transition would be to allow an alternative compliance pathway for the materials credits ("Backwards compatibility"-a bit more on this in a separate post) and h
leed online v3 user interface
posted by sam Alfassy on
i can not make the leed online interface show normalyy - all text is alligned to the right side of the screen. I am working with a left to right interface (for hebrew language) i have downgraded my
submit to leed-online compliance
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I
NC Innovation credits from EBOM, design or construction review?
posted by SmithGroup BG+LU FW on
If an ID credit is first submitted during preliminary review for design credits and the reviewer's comments require client input that will take longer than 25 (working) days for us to document can
Why aren't all v4 credits and prereq's available for comment?
posted by Joseph F. Bridger on
I was confused to see that I could not post comments for LEED v4 for all of the credits and prereq's I had assembled comments for. Why are some available and some not?