LEED Certification for Mixed-Use Office and Residential
CS-v4 MPR3:Must comply with project size requirementsposted by Van Jomel Garcia on
We have a project composed 60 floors, 1st-40th floor is office (12-40 floors leasable) and 41st-60th floor will be residential. In relation to the subject above, is it also possible to pu
Rating system for Mixed use building? NC possible?
posted by Tatjana Ernst on
We are want to certificate a building in Germany and need to know if its possible to certificate a mixed use building according to NC?
Project relocated to a new site
NC-v4 IPc1:Integrative processposted by Sara Goenner Curlee on
I have a project that just completed the IP credit requirements before the end of SD, and now finds itself likely needing to relocate to a different site. The proposed new site is about 1
Sustainable shopping centers
posted by Kate Bubriski on
I'm looking for precedents of retail centers (think outdoor centers with multiple buildings or converted indoor malls) that have incorporated any of these strategies.
Open Zoom Peer Support Session today at 4pm eastern/1pm Pacific
posted by Nadav Malin on
Hi Leaders,
If your experience was anything like mine, it was a stressful night. I'm feeling a hunger for talking with smart, passionate people about what this all means.
Steel- Default of 25% post-consumer content
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Jutta Berns on
If someone could please confirm whether the following guidance from the LEED v4 Reference Guide is still applicable to LEED v4.1 projects: "Default recycled content for steel products where no
ID+C Retail -- Dishwasher requirements for WEp1
CI-v4 WEp1:Indoor water use reductionposted by BEE Incorporations on
A retail space inside a mall is exploring to purchase a dishwasher. This dishwasher will be used by the limited store employees only twice a day.
FTE of 8 Hours per day or 40 Hours per Week
posted by Krithikha Muthukrishnan on
We would appreciate some clarity regarding the calculation of FTE. We recently submitted for a v2009 O+M project which is a factory with a Ten Hour Shift and a 6 days a week working.
EV Ready - Raceway
NC-v4.1 LTc8:Electric Vehiclesposted by Jill Kurtz on
We have a project that is seeking certification. It shares parking with existing buildings on its campus.
unmet load hours
CS-2009 EAc1:Optimize Energy Performanceposted by Elisabetta Annoni on
Hi, for the unmet load hours test there is a throttling range to be defined. As I understand from ASHRAE 90.1 there is no fixed value for this range, how shuold it be defined?