Forum quick links
Project boundary
NC-2009 PIf2:Project Summary Detailsposted by Nick Toon on
Hi, we are building an airport under new construction (2009).
Can EVSE charger spaces have a limited time for charging?
NC-v4 LTc8:Green vehiclesposted by Cindy Quinn on
I have a client who is considering their EVSE spaces to be signed as:
"Electric Vehicle Charging Station
1 Hour Max
Are you hiring?
posted by Jonathan Weiss on
Greetings, Green Gurus! As many of you know, I teach a course at the University of Pennsylvania's Graduate School of Architecture, and one of my former students has just graduated from their
Compartmentalization and natural ventilation
Homes-v4 EQp7:Compartmentalizationposted by Fábia Leal on
Hi,
I have a project with 40 atteched single family houses and the outdoor air supply is by natural ventilation through grilles on the facade.
Supplemental Documentation
Pilot-Credits SSpc82:Local food productionposted by Pamela Mendez on
Does anyone have sample supplemental documentation to show the following: Confirming the permanent infrastructure has solar access, fencing, watering systems, garden bed enhancements (such as rais
Purchasing Lamps Innovation Credit
NC-v4 INc1:Innovationposted by Jason Garvens on
For the Purchasing Lamps Innovation credit the requirements section states: "Must meet the exemplary performance criteria of the base credit (an average 35 picograms per lumen hour or less)."
Different VOC Formats
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Lawrence Lile on
SCAQMD generally lists paints in terms of grams per liter VOC content. I have seen several paint manufacturers listing VOCs in other formats.
10 Diverse Uses
NC-v4 LTc6:Bicycle facilitiesposted by Laura Heagler on
Our project is an office building located on a Univeristy campus. All the roads on campus are 25MPH or less.
1) Is there a minimum length of the bicylce network?
LEED ID+C, Retail
Retail-CI-v4 EAc2:Optimize energy performanceposted by Toshif Ruikar on
Hi, My project is a retail shop in a big mall.