Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Industrial buildings: EAc1 Optimize Energy Performance

CS-2009 EAc1:Optimize Energy Performance
posted by  Jane Long  on 

Hi, I’m working on a pre-assessment for a large manufacturing (aircraft) plant.

4
Fri Sep 9, 2011, 3:42 pm
4
Fri Sep 9, 2011, 2:16 pm

Modeling OA for naturally ventilated space

NC-2009 EAc1:Optimize Energy Performance
posted by  Orlin Velinov, PE  on 

We have a project that is a parking garage structure.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Thu Sep 8, 2011, 3:04 pm

Energy Modeling: Dome (Design) vs. Dome (Baseline)?

NC-2009 EAc1:Optimize Energy Performance
posted by  Nelina Loiselle  on 

I am working on the LEED Certification of a 23,000sq.ft. concrete "business continuity" dome. It is literally a concrete dome.

3
Thu Sep 8, 2011, 2:49 pm

SLL Credit 3 Reduced Auto Dependence

General forums
posted by  Peter Doo  on 

Requirements emphasize "existing" transit service. I assume that new transit service is negotiated as part of the project plan will also count. Please confirm.

2
LEED Faculty (ND), AICP, Senior Associate, Green Urbanism
Global Green USA
LEEDuser Basic Member
36 thumbs up
Thu Sep 8, 2011, 12:57 pm

green power for residential hi-rise

NC-2009 EAc6:Green power
posted by  Lorey Flick  on 

How can this credit be achieved if the building is a high-rise residential building where all apartments are separately metered? This is a rental building.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 7, 2011, 11:44 pm

Tenant spaces simulation without HVAC

CS-2009 EAc1:Optimize Energy Performance
posted by  victor mattos  on 

Does anyone knows if the tenant spaces shall be simulated with HVAC system for a shopping mall or can i just simulate with idealloads? I searched in the LEED Reference guide Appendix 2 but it does

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 7, 2011, 7:06 pm

Seawater flushing

CI-2009 WEc1:Water Use Reduction
posted by  Edwin Wealend  on 

Hi Does anyone know if sea water flushing which is non-potable water can contribute towards these credits. We are working on new LEED-CI project in Hong Kong that uses sea water for flushing conne

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Sep 7, 2011, 5:45 am

Warehouse Flush Out

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Curt Pascoe  on 

Both NCv2.2 and v2009 are clear with the temperate and humidity constraints.

2
P.E., LEED AP BD+C
Ryan Companies US, Inc.
LEEDuser Basic Member
87 thumbs up
Tue Sep 6, 2011, 12:27 pm

temporary use of hvac during construction

Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Keelan Kaiser  on 

I have another question similar to above. We have a project that is substantially complete with construction, the cleaning crews are in right now. Only flooring remains to be installed.

2
Architect and Educator
Serena Sturm Architects and Judson University
LEEDuser Basic Member
93 thumbs up
Sun Sep 4, 2011, 2:54 am