Forum quick links
Integrative Process Prerequisite
posted by Melissa Wrolstad on
Why is this prerequisite only for Healthcare?
Residential - Commercial Project
posted by Omer Moltay on
Dear All, A single building consists of: 10400 m2 commercial areas (retail & restaurant) at ground level floors 11000 m2 residential areas (multifamily) at the 9 above grade floors 12000 m2 un
NPD P3: Extra non-motorized connectivity
posted by Daniel Costantino on
Hello all, After several positive experiences on this forum, I return with another question. I am working on a project with internal streets.
Defer After Initial Design Review
posted by Breana Detzler on
We recently received comments on our initial design review submission.
initiation of the review
posted by Alicja Bieszyńska on
We have finished uploading all the documentation for the Design Submittal and marked all credits "Completed".
FSC Wood is good, but NOT the ONLY one!
posted by Ward Miller on
The battle in the U.S.
Template issues for Option 1
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by renee jimenez on
Per the LEED reference guide it states that for Option 1 we are to “Confirm that 100% of all ceiling areas (excluding lights, diffusers and grilles) in all classrooms and core learning spaces are f
A credit that's not in a category?
posted by Nadav Malin on
Is anyone else concerned about the structure of this draft, in that the Integrative Process credit is floating off by itself, outside of any category?
Public Metering/Autocontrol Lavatory Faucet – Gallons per Cycle
posted by Jeremy Cressman on
It appears that the metering faucet calculation providing a Gallons per Cycle option for flow rate has been removed from LEED 2012 Water efficiency prerequisite and Indoor water use calculation. I
Alternative Commuting
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Aron Weis on
Does the fact that 80% of the people in the building I am evaluating for LEED-EB have FlexFuel cars help? Even if they do not use FlexFuel (Ethanol 85)?