Forum quick links
Materials in Major Renovation Projects
NC-2009 MRc2:Construction Waste Managementposted by JP Rout on
We have Project intending to be registered under LEED 2009 BD+C for major renovations.
Compressor replacement + R422D refrigerant
EBOM-2009 EAc5:Enhanced Refrigerant Managementposted by Norbert Szircsak on
Dear All, I have two issues where I don't really know what would be the proper solution. 1. After about 10 years one of the compressors in a chiller went wrong and has been replaced.
Construction Activity and Pollution Prevention
NC-2009 SSp1:Construction Activity Pollution Preventionposted by JP Rout on
We have Project intending to be registered under LEED 2009 BD+C for major renovations.
Modeling semi heated space in baseline case
NC-2009 EAc1:Optimize Energy Performanceposted by Gopinath Vasu on
Hi All, I am working on a project with warehouse space which is heated and ventilated with heating capacity greater than 3.5 Btu/hr ft2 and falls under the semi heated space category. My question
Beach as a basic service
NC-2009 SSc2:Development Density and Community Connectivityposted by Lucas Bizelli on
We have a project in Rio de Janeiro that is near to the beach (between 1/2 mile).
HC near Airport
Healthcare-v2009 IEQc2:Acoustic environmentposted by Saymon Grauppe on
Hello. I'm working on the design of a hospital and there is a doubt in the table 1.3-1 of the Sound & Vibration Guidelines FGI. The hospital is located 2600ft from the runway threshold .
Supply fixtures to tenants without installation
CS-2009 WEp1:Water Use Reductionposted by Ali Soufan on
Would it be possible to claim performance improvement by supplying the toilet fixtures for all tenants without installing them?
PRM Modelling Queries
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I have 2 questions in relation to the 90.1 Energy Model. 1) Is Dublin (Ireland) in ASHRAE climate zone 5 or 5a. 2) The building to be modeled is a 5 storey building with a basement.
Estimate for Shower Usage with Default Occupancy
CS-2009 WEp1:Water Use Reductionposted by Brian Salazar on
Hi! I have two Core & Shell projects where the landlord is providing showers and changing rooms. There's a toilet inside the changing room area.
Regional Material
CI-2009 MRc5:Regional Materialsposted by Susan Niemiec on
My company makes steel storage products. We are 90 miles from Gary Indiana where the raw products are smelted and fabricated into coil and sheet steel produced for us.