Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Prescriptive: Differents visible light transmittances

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Francisca Herrera  on 

Hello, I'm trying to get IEQ C8.1 by the prescriptive option, but I'm having problems with the calculation of the visible light transmittance. Inside of the same space I have an outer glass facad

1
Fri Jul 31, 2015, 3:36 pm

mandatory efficiency for backup system

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Shall the mandatory efficiency of section 6.4 (Tables 6.8.1) be verified also for a chiller that works as backup system (the chilled water is provided in normal conditions by district cooling)? Be

1
Fri Jul 31, 2015, 1:26 pm

Emissivity Values are Unknown

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  ryan kremer  on 

I apologize if this is a repeat comment.

1
Fri Jul 31, 2015, 3:08 pm

Janitor closet inside restroom

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Chen Jin  on 

In our project, each janitor closet (only for the storage of cleaning equipment and common deterdent) is placed inside a restroom, occupying a toilet cubicle.

1
Tue Aug 18, 2015, 3:42 pm

Leasable areas fed by the utility

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Ricardo Sá  on 

An office building is being certified under LEED C&S. All leasable areas will be fed directly by the utility.

1
Mon Aug 3, 2015, 1:21 pm

Ventilation strategy for rooms added after construction work

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Ricardo Sá  on 

An office building that is being certified under LEED C&S will have 80% of its gross floor area without a complete interior fit-out at time of construction work completion.

1
Fri Jul 22, 2016, 1:54 pm

ASHRAE 62.1 mandatory requirements applied to tenants

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Ricardo Sá  on 

Sorry for question overlap but this is the first time we're working on a C&S. An office building that is being certified under LEED C&S will have 80% of its gross floor area without a comp

0

CO2 sensors in tenanted areas

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ricardo Sá  on 

An office building that is being certified under LEED C&S will have 80% of its gross floor area without a complete interior fit-out at time of construction work completion.

1
Wed Oct 14, 2015, 8:15 am

Partition walls after C&S contruction work

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Ricardo Sá  on 

An office building that is being certified under LEED C&S will have 80% of its gross floor area without a complete interior fit-out at time of construction work completion.

1
Mon Aug 3, 2015, 12:32 pm

IBEAM LEED USER POLICY

EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Program
posted by  Craig Sheehy  on 

I cannot amend the IBEAM IEQ 1.1 Preventative maintenance tab for the following because the excel form is in a protected view, when I unprotect the view it prompts me for a password.

1
Wed Jan 20, 2016, 7:46 pm