Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

waterless urinals

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Emmanuel Pauwels  on 

We have tried to comply with this credit using waterless urinals and dual flush toilets with a very low flush (3L/435L)

0

Existing Parking conditions

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  John Stouffer  on 

The existing conditions of the site have 55 existing parking spaces. Our plans show that we are taking out 14 parking spaces and adding 16 addition spaces, totaling 71 parking spaces.

1
Sun Nov 3, 2013, 2:43 am

Building Automation System (BMS)

NC-2009 EAp2:Minimum Energy Performance
posted by  Marco Antonio  on 

Hello We are developing a project of air conditioning a building certified LEED NC 2.2 and wonder if all Fancoletes and fans small (about 200), should be interlidados in the building automation sys

1
Fri Apr 5, 2013, 4:00 pm

Adjoining Historic Buildings

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Brownsville Area Revitalization Corporation  on 

We are working to restore two commercial/residential historic buildings with the intent of achieving LEED certification.

1
Mon Apr 29, 2013, 2:32 am

Regional industrial practices

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I am facing a problem meeting the eap2 credit since my project presents almost 80% energy cost related to process.

1
Fri Apr 5, 2013, 3:56 pm

Determining FTE, PTE

NC-2009 PIf3:Occupant and Usage Data
posted by  Catherine Blakemore  on 

How are the FTE and PTE numbers derived? The project is for a surgical addition.

1
Fri May 17, 2013, 12:54 pm

Space listings & supporting documentation

Healthcare-v2009 IEQc2:Acoustic environment
posted by  Catherine Blakemore  on 

I am not familiar with this credit so bare with me. Does each space (room) have be be listed on the IEQc2 form? Is there spread sheet format that can be used? Any recommendations will be greatly

1
Tue May 7, 2013, 9:15 pm

LEED for Multi-Family Homes Bicycle Security

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Nicole Koedyker  on 

For the bike storage at this location, our intent is to create closets similar that can be locked, which would certainly meet this requirement.

0

Full list of

General forums
posted by  Michael E. Edmonds-Bauer  on 

I was checkin the USGBC website looking for more LEED interpretations that could give us a hand in documenting SSc4.3.

0

Hi all, (I posted this

LEED Rating System Selection
posted by  Diaa Madkour  on 

Hi all, (I posted this comment under MPR section but thought it may apply here too) My company received a request for proposal to work as LEED assessor for three office buildings under core and she

0