Forum quick links
Joint Compound and Joint Tape - GREENGUARD Gold requirements
NC-v4.1 EQc2:Low-Emitting Materialsposted by Jason Biondi on
Here is the technical advice we receive for one of the project:
Hard-lid ceiling with access panel
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by on
For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling?
Ventilation Requirements for Sporadically Used Spaces
NC-v4 EQp1:Minimum indoor air quality performanceposted by Santiago Avila on
Hello everyone,
How to model process chilled water load?
NC-v4 EAp2:Minimum energy performanceposted by Eric Dixon on
My proposed design for lab utilizes a heat recovery chiller connected to geo-exchange. There is a 40 ton process chilled water load on the heat recovery chiller.
LTc7 - Reduce parking footprint - examplary performamce
NC-v4 LTc7:Reduced parking footprintposted by Maria Peralta on
Hello!
Maximum Distance from Parking to Site
NC-v4 LTc7:Reduced parking footprintposted by Laraib Raza on
Hello All LEED Users,My question is what is the maximum distance allowed from the building(site) to parking? If the Parking is located outside of the site boundary?
*time sensitive* Presidential election advocacy opportunity
posted by Clark Brockman on
Greetings to all of the sustainability leaders in the Green Commons!
Option 1 No Parking or Reduce Parking
NC-v4.1 LTc7:Reduced Parking Footprintposted by Bryna Dunn on
When I am looking at the credit language, the first two requirement statements not connected by "OR" or "AND". The third statement says "Alternatively". Has anyone submitted successfull
Heat recovery HVAC
NC-v4.1 EAp2:Minimum Energy Performanceposted by Josef Andersen on
Hi!
We are currently discussing a design solutions for the HVAC in a project that should fulfill LEED requirements.