Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EA Prerequisite: Energy Performance

LEED v4.1 Discussion Forum
posted by  Cesar Ruiz  on 

I have noticed that in LEED OM v4.1 prerequisite Energy Performance the explanation about calculating the outside temperature adjustment factor is incomplete. This problem happens in both the

0

Using Trane Trace for Solar PV Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Bo White  on 

Our building will have on-site (and dedicated campus) solar PV, and we're using Trane's Trace program for our ASHRAE 90.1 energy model.

3
Senior Project Engineer
NegaWatt Consulting
LEEDuser Basic Member
5 thumbs up
Mon Jan 14, 2019, 7:30 pm

Advanced Energy Metering Whole Building Energy Sources

NC-v4 EAc3:Advanced energy metering
posted by  susan eguia  on 

Hi,

We have Fire Station project and submitted Advanced Meter Cutsheet for Electrical.

3
Default Avatar
LEED Coordinator/Construction Administrator/Business Development
Building Solutions Group, Inc.
LEEDuser Basic Member
47 thumbs up
Mon Jan 14, 2019, 2:52 pm

Core & Shell or Healthcare situation

LEED Rating System Selection
posted by  KATHERINE AGUILAR  on 

If the building will be constructed and leased to be used as a medical facility by an unknown operator, it is possible to apply for a Core & Shell certification?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Jan 14, 2019, 1:37 pm

Mastersite Calculations

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Ernst Schriefl  on 

Hallo,

my project consits of 7 Buildings, whiche are certified under one Mastersite.

Because of this i have serveral questions:

0

Version changes in recertification

LEED Recertification: When and How
posted by  Reshadee Weerasooriya  on 

Hi, our project team has encountered recertification for two LEED buildings from LEED 2009 as well as LEED v2. The problems we have are,

2
Mon Jan 14, 2019, 3:10 am

Waste audit(s) schedule when recertifying a LEED EBOM project

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Vanessa Seibert  on 

My client's building obtained the MRc6 (Waste Stream Audit) credit four years ago with our LEED EBOM v2009 certification. We did not receive MRc7 (Waste Mgmt of Ongoing Consumables).

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Sun Jan 13, 2019, 11:02 pm

Portfolio Manager - All Requests Suspended for Energy Star Scores Until Early 2019

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Michelle Bracewell-Musson  on 

I will assume most are aware that Portfolio Manager has suspended applications for Energy Star Certification from September 2018 until early 2019.  As a requirement for EAc1 to be earned,

4
Sat Jan 12, 2019, 5:50 pm

Existing Building as LCA Baseline

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Kristen DiStefano  on 

One of the four options for creating LCA baselines according to this LEED Interpretation - https://www.usgbc.org/content/100002019 - is to use an existing building, and make modifications necessary

4
Default Avatar
President
Athena Sustainable Materials Institute
LEEDuser Basic Member
6 thumbs up
Fri Jan 11, 2019, 10:14 pm