Forum quick links
Envelope Commissioning in CI-v4
CI-v4 EAc1:Enhanced commissioningposted by Heather DeGrella on
Hi All,
Additions to Existing Cold Storage Facility
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dustin Norton on
I am working on a project that includes a large existing cold storage facility that will essentially double in size after renovations.
Is the M1 certified floorcovering sufficient to show compliance under the credit IEQ credit 4.3 flooring systems
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Gulafshan Bano on
I am in process of evaluating electrical room “floor covering” product (vinyle cover).
Flush out using building emergency exhaust ventilation system
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Mahesh Shankar on
The project is a retail store which is not flushing out the space using outdoor air. The exhaust ventilation system of the building is used to
Option 2 - Example
NC-v4 EQc5:Thermal comfortposted by Konstantina Kalliakoudi on
Hello to all,
I have an European project and I will follow Option 2. But I have difficulties in understanding the Method.
Leed v4 BD+C examples
posted by Konstantina Kalliakoudi on
Hello to all,
Is there a link where I could find real examples of buildings as registered for LEED New Construction v4 BD+C?
Materials inside the building
NC-v4 EQc2:Low emitting materialsposted by Konstantina Kalliakoudi on
Hello to all,
In my understanding this credit "Low emitting materials" concerns materials inside the building, and not outside. Is this right?
Thanks
Furniture always in scope of work?
NC-v4 EQc2:Low emitting materialsposted by Raphael Sperry on
I've noticed that the LEED reference guide says "Furniture is considered part of the scope if it is installed at the time of occupancy, regardless of who specified or provided it." And I've never
DHW limitations
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hi, I've been having some trouble regarding DHW modeling.
Case 2 Option 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Patrick Cellie on
I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system.