Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
3
President
Doo Consulting LLC
LEEDuser Basic Member
136 thumbs up
Thu Mar 28, 2019, 5:32 pm
1
Mon Apr 8, 2019, 4:20 pm

Lighting power in tenant spaces

CS-v4 EAp2:Minimum energy performance
posted by  Matt Edwards  on 

We have a question about the baseline and proposed lighting for tenant spaces, and more specifically how to input those in the LEED v4 Minimum Energy Performance Calculator v05 spreadsheet.

7
Thu Mar 28, 2019, 5:12 pm

Separation of space requirements if stove is separately vented

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Ann Kelly  on 

All,

If we have an electric residential grade stove, which is separately vented, located in an open break room setting, will this satisfy the requirements for separation of space?

0

Water Restoration Credits - Asia

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Emily Tan  on 

I purchased water restoration certificates for an ID+C v4 project through BEF.

0

Current Facilities Requirements and O&M Plan

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Chris Bennett  on 

I am trying to determine if there a specific requirements regarding how the Current Facilities Requirements and O&M Plan is provided.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Mar 28, 2019, 3:02 pm

Peer Networks Meetup at Living Future--5:30 Thursday Room #604

SC Leaders
posted by  Nadav Malin  on 

Hi folks,

We've arranged a room where we can gather for an hour and check in during the Thursday afternoon reception time at Living Future. If you'll be there, come join us!

0

Support research to quantify the potential of the built environment to be a carbon sink

Green Commons
posted by  Larry Strain  on 

I am forwarding this request from Kate Simonen from the Carbon Leadership Forum to support a grant application for this research.

0

rating system for a manufacturing facility?

LEED Rating System Selection
posted by  Gail Napell  on 

Hi all

we're looking to accredit a manufacturing facility with about 85% mfg/ warehouse and  15% offices/ amenity space.  Which rating system is the most applicable?

2
Wed Mar 27, 2019, 5:10 pm