Forum quick links
Exhaust Requirement for Dwelling Units in LEED BD+C (ASHRAE 62.1 2010 vs ASHRAE 62.2 2010)
NC-v4 EQp1:Minimum indoor air quality performanceposted by Rahil Shah on
Hello everyone,
I hope everyone is safe and sound during this time of crisis.
Rubber Flooring System LEED compliance
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mario S. on
We are working on a LEED NC2009 project and we are installing a rubber flooring system.
Mixed-use projects
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Tatiana Carreno on
What are the requirements for Mixed-Use projects? the guide only refers to residential areas.
If bare raised floor is covered with carpet - is it reused?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Diana Nezamutinova on
1. In our fit-out project in London the base building provides raised access floor that cannot be used as is due to acoustic and aesthetic reasons.
Interior reuse calculation, What is counted?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Mark Ragucci on
Our project is on the second floor of a 3 story building. To start the space has had finishes removed for hazardous abatement before construction demo.
Achieving monitoring requirements
NC-v4 EQp1:Minimum indoor air quality performanceposted by Kelvin Su on
Sorry i posted this under the wrong version before, reposting it her. It is a BD+C v4 project we are working on and struggling a bit with the monitoring requirements for minimum IAQ.
Filtering for direct evaporative cooling
NC-v4 EQp1:Minimum indoor air quality performanceposted by Kelvin Su on
Do we need to meet the filtration requirments for fresh air when using a DEC cooling?
3 Year Plan Management
Pilot-Credits SSpc55:Bird collision deterrenceposted by Elissa Wu on
Is there any strict form or method in which this is to be completed (besides the requirements in the text already)?