Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by dianti avo on
Hello,
Is there any Alternative Compliance Path for ASHRAE 90.1-2010 (mandatory provision) for South-East Asia region?
Thanks!
Approach to LCA
NC-v4 MRc1:Building life-cycle impact reductionposted by Barbora Cicvárková on
Hi to all,
we would like to discuss a question about determining baseline and proposed building to meet LCA credit's requirements and meet the whole credits intent.
Organizations that provide offsite conservation
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Varun Chandra on
Hello, we have a project that is looking to acheieve SSc5 by signing a contract with a thrid-party conservationist. We have numbers from TNC but need required to collect 2 more quotes.
WaterSense & Future Baseline
EBOM-v4 WEp1:Indoor water use reductionposted by Waleed AlGhamdi on
I have a project in a peculiar situation that is not addressed outright by the guidelines language and I can use some help in interpreting the rules.
LEEDonline Form
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Kath Williams on
It has been a long time since we worked on a NC-2009 project. Long been into Version 4/4.1 projects.
Ventilation for the building as a whole or by space?
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Sara Greenwood on
Can you meet the enhanced ventilation performance criteria by providing >30% ventilation for the building as a whole, even if you do not meet this performance for all zones/spaces?
SSc5 Offsite Restoration Contract/Performance Period
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Randi Davis on
The performance period for our project is only 90 days.
ASHRAE 2007 G 3.1.1 Exception B
NC-2009 EAp2:Minimum Energy Performanceposted by on
I am working on a retail project with three restaurant spaces. I got a comment below from the LEED reviewer.