Forum quick links
LEED EBOM v4 minimum occupancy requirements
EBOM-v4 EAp2:Minimum energy performanceposted by on
Hello,
Does LEED EBOM v4 require a minimum occupancy requirement to be able to be certified?
Mixed use buildings minimum storage spaces
NC-v4 LTc6:Bicycle facilitiesposted by Yara Salama on
Hello,
feed back the survey
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Junko Miyamoto on
Hellow.
I need to complete the feedback survey for achieving the pilot credit point. Is the project information that input in the survey will be published ?
Slag Usage in LEED Projects
NC-v4.1 MRc4:Material Ingredientsposted by Brian Graf on
Hello Everyone!
Sisal 100% Natural Fiber Carpet
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Andrea Tirao on
Our project is a museum which targets IEQc4.3. One of the specified carpet for the project is 100% Sisal and we cannot find a manufacturer of Sisal with Green Label or Greenguard certification.
Stores without connection to main building
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Dear All,
Unmet hours for the proposed model
NC-v4.1 EAp2:Minimum Energy Performanceposted by Ying Lindsey on
If the baseline model meets the 300 unmet hours requirement but the proposed model does not, this may be because the design of that project has an issue. So there is no way to meet 300 unmet