Forum quick links
Waling Distance 400 m or 800 m?
CS-v4 LTc5:Access to quality transitposted by Stephan Zweig on
Dear all,
1) Does subway station as light rail station count? So there applies the limit of 800 m?
RE: v.4 Core & Shell - RECs as Offsite Power
CS-v4 EAc5:Renewable energy productionposted by Yoyo Shek on
Hi LEED user,
We have a C&S project includes retail and office towers with limited space for renewable power generation.
Acoustic Performance Credit for Residences
NC-v4 EQc9:Acoustic performanceposted by Andrew Parise on
Two aspects of this credit seem to make it not achievable for new residential buildings - Reverberation Time <0.6 seconds for residences, and STCc 50 from residences to corridors.
Allocation of User Groups in Elementary Schools
Schools-NC-v4 WEp2:Indoor water use reductionposted by Steven Burke on
Two questions. Question 1: Typically in school projects we have several unisex restrooms without urinals.
Occupancy rates Appendix 2 Daily averages or peak occupancy
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Julio Fernandez Amodia on
Hi there,
I am currently calculating the peak occupancy and daily average occupancy for a mall building.
Data Sheet or Laboratory test report?
NC-v4 SSc5:Heat island reductionposted by Samer Alhmdan on
Hello, Do we need a laboratory test report to substantiate the SRI, or the Data Sheet by manufacturer is sufficient ?
Rubber Playground Surfacing and Decomposed Granite
Schools-EBOM-v4.1 SSc2:Heat Island Reductionposted by Camila Luong on
Hi! During construction our client has added a playground area and changed a small ampitheater from grass to DG.
Total Roof Area vs. Total Applicable Roof Area
CS-v4 SSc5:Heat island reductionposted by James Jin on
Hi all,
Fully opacified spandrel glazing
Pilot-Credits SSpc55:Bird collision deterrenceposted by darryl strouse on
We are spandrelizing a significant portion of our project's glazing.