Forum quick links
LEED AP without speciality
ND-v2009 IDc2:LEED Accredited Professionalposted by David ESPAGNET on
Dear Sir Or Madam, Can one of you confirm me if a LEED AP without speciality is eligible for this credit? Many thanks in advance
IEQc3.3 LEED EBOM 2009
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Teresa Farmer on
Do I need to submit the product purchase tracking sheet when submitting for this credit?
Recertification Guideance for credits implemented every 5 years
posted by Antoni Paleshi on
I have a few projects that certified under LEED EB:O+M 2009, receiving their certification in 2011 or 2012.
Alternative Compliance Path from one project for another project
posted by CT G on
Hello, We have submitted an alternative compliance path for WEp1 which was denied. However, the same alternative compliance path was accepted during a previous review for another project.
EQc5 Negative Exhaust Rates
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Scott West on
I'm trying to figure out the exhaust airflow rates required for chemical pollutant source rooms in a hospital (e.g. janitor's closets, copy rooms, etc.).
site selection C1
NC-2009 SSc1:Site Selectionposted by Elisa Sequeros on
I would like to do the exam LEED AP and I have a very specific question : FOR A PREVIOUSLY UNDEVELOPED SITE, WHAT WATER BODIES DO NOT HAVE TO MEET THE 50-FOOT SETBACK CRITERIA TO COMPLY SUSTAINAB
Entryway Grates and Mats
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Elizabeth Felder on
The building has entryway grates a few feet in length in the vestibule of all building entrances.
PVC floor adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Valentin Grimaud on
Dear experts, we are purchasing the PVC floor adhesive, but i'm not sure which category is more suitable for this kind of adhesive in leedonline form, we considered "Rubber Flooring Adhesives" but
Outdoor Measurement Device location
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Carolina Vergnano on
We are working on a project that has a fancoil located on the top of the building that will treat the outdoor air and deliver it to each non densely occupied zone.
EQc3, EQc5 and filtration requirements
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Steve Loppnow on
I'd like to confirm that if a project is pursuing EQc5, that they must use MERV 13 filters for flush-out but can still use MERV 8 filters on equipment that is operated during construction.