Marsha Maytum Book - Deadline June 23rd

Green Commons
posted by  Mary Ann Lazarus  on 

Hi: Great to see so many of you at AIA COTE Top Ten last week.  I'm forwarding the message below for those of you who know Marsha Maytum and can contribute to this important effort.

0

Mobile Dumpster Compacting - Smash My Trash

NC-v4.1 MRp2:Construction and Demolition Waste Management
posted by  William Truszkowski  on 

There are a number of mobile dumpster compacting companies such as Smash My Trash or Crushr that provide dumpster compacting to roll-off 20-40 yard dumpsters.

0

If the site is walking distance from two separate stops but service the same routes can you count both

NC-v4 LTc5:Access to quality transit
posted by  David O'Connell  on 

The site is close to two different stops alexion and BDC but the two stops are serviced by the same routes ? can you count both stops towards the total number of buses i.e.

0

LPD of Building Area Method

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

1. If we decides to use 'Building area method' for energy modeling. We have to building area type including office and parking garage.

10
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 15, 2023, 12:35 pm

Roads with 40 Km / h without bicycle paths or trails are considered as bicycle network?

NC-v4.1 LTc6:Bicycle Facilities
posted by  Sara BENLOUBA  on 

We have a project located in an area where the bicycle network is not planned but the building is served by a major national road which limits the speed to 40 km /H.

6
Thu Jun 15, 2023, 12:09 pm

"No cooling tower" option removed

NC-v4.1 WEc3:Optimize Process Water Use
posted by  Paula Melton  on 

It appears that Option 2, "No Cooling Tower," has been removed from this credit with addendum #10002465.

9
Sustainability Manager
Burns & McDonnell
LEEDuser Basic Member
24 thumbs up
Wed Jun 14, 2023, 10:24 am

Standard EPD to use in LCA

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Jose MARTINEZ  on 

Good afternoon colleagues, we have recently received comments (by LEED reviewers) about the EPDs we use for LCA in the baseline model that are not the standards to consider in the U.S.

0

Non-occupied Garage - Flush required?

NC-v4 EQc4:Indoor air quality assessment
posted by  Leanne Conrad  on 

If we have a separaetly HVAC served storage garage that is quite large and mimininally heated, does this area have to be included in the whole building flush and maintain the higher than normal tem

5
Owner/Architect
Marquis Architecture
LEEDuser Premium Member
7 thumbs up
Wed Jun 14, 2023, 6:57 pm

Measurement regard outside air measurement

EBOM-v4.1 EQp1:Minimum Indoor Air Quality
posted by  Michael Ling  on 

Hello LEEDusers, I have a project which consist a typical office building in Hong Kong, each floor contain 2 PAU which contain 200L/s flow rate, the building is not very large each floor consist 2

0