Forum quick links
LEED 2012 Ballot
posted by Jackie Evans on
Speaking as a manufacturer and someone who has been involved with LEED since its original version of NC, I commend the USGBC for trying to move things forward, but in my own experience, true life c
The alternative commuting transportation survey
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Linh Huynh on
Hi, I have read the instruction for SS Credit 4 and choose option 3.
What are the requirements for the inspectors?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Jose Gonzalez on
We are completing a high-rise in Surfside, FL and we fall under the jurisdiction of FDOT, FDEP, and the EPA as this is a Beach side construction.
Multiple Bulidings within LEED Project Boundary
posted by Emanuele Incorvaia on
Hello Project that I am working on includes two buildings one that is pursuing LEED Certification (NC v2009) and one that will not (storage building that is non-certifiable).
The most stringent rate for vehicles
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by milton muñiz on
I chose option 1 of SSC4 but the building is Located in Guadalajara Mex.
LEED ND - Construction Credits
posted by Shakir Ismail on
Help needed!...Is there a list of construction/design credits for LEED ND projects on LEED Online? If yes, I need a list of LEED ND (Stage 3) credits/prerequisites pertaining to construction only.
Mixed Use Residential Baseline 90.1-2004
NC-2009 EAc1:Optimize Energy Performanceposted by Ruben Porter on
*Moved to NCv2.2 Credit EAp2
Historical data with building and tenant changes
EBOM-2009 IOc3:Documenting sustainable building cost impactsposted by Tiffany Moore on
I'm trying to clarify how or what to provide in terms of historical data for an O+M project with a performance period that will begin at day 1 of occupancy in an NC project.
AGMBC Part 2
posted by Diana Carro on
Hello. Do you know when LEED Online functionality and Certification (and Registration) Fees will be available for Part 2 of the AGMBC? Thanks!!
Chilled Water Pumps, Primary/Secondary
NC-2009 EAp2:Minimum Energy Performanceposted by Aaron Dahlstrom on
ASHRAE 90.1-2007 Sec G3.1.3.10 requests that users specify pump power of 22 W/gpm, with a primary / secondary pumping system and variable flow on the secondary side.