Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EA Cre 3 - Exemplary performance

CS-2009 IDc1:Innovation in Design
posted by  Adam Targowski  on 

I would like to make sure of one thing.

1
Fri Sep 2, 2011, 4:38 pm

Tenant area-HVAC system type

CS-2009 EAc1:Optimize Energy Performance
posted by  Amgad Khattab  on 

We are modeling a Core & Shell office building where the HVAC system is in the tenant scope. we are only delivering chilled water and outdoor air to the tenant areas.

0

Naturally ventilated spaces

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Nader NAKIB  on 

I appreciate your interpretations on the ASHRAE 62.1 regarding the requirement for naturally ventilated spaces: 5.1.1 Location and Size of Openings: Naturally ventilated spaces shall be permanentl

1
Wed Nov 23, 2011, 3:32 pm

Definition of woonerf

General forums
posted by  Ricardo Sobral  on 

In LT Walkable project site, the term "woonerf" is used, but in the Glossary section the definition of this term was apparently erased. Shouldn't it be taken back, to help clarify it?

0

Removing Hardscape

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Emily Catacchio  on 

Has anyone heard of an alternate compliance path where we count the new greenspace we're creating where we're removing hardscape, as a reduction in the heat island effect on the site?

1
Fri Sep 2, 2011, 4:43 pm

Performance Period - EBOM v2.0 - Minimum period

Performance Period
posted by  Tyra Sorensen  on 

Is there an advantage or disadvantage to using the minimum performance period? Using the shortest possible period to earn the credit will mean the fewest numbers to crunch and document.

1
Mon Oct 31, 2011, 4:36 am

Back up Energy source in Energy Modeling

CS-2009 EAc1:Optimize Energy Performance
posted by  Paula Hernandez  on 

I have an office building that will use solar pannels to generate hot sanitary water. But it will have an electric heaters aswell for back up. How can I consider this in my Model???.

1
Wed Oct 19, 2011, 5:10 pm

Midrise 4-6 Stories

LEED for Homes (LEED-H) Forum
posted by  Hsin-Yi Hsieh  on 

Can a 4-6 story multifamily use LEED for Homes instead of LEED for Midrise?

1
Sat Sep 10, 2011, 6:38 pm

Unlabeled fenestration visible light transmission(VLT)

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  gwenedd murray  on 

I have several projects where the fenestration VLT assembly is unknown or unlabeled. These projects are renovations where the exterior envelope was not changed.

1
Mon Sep 12, 2011, 5:04 pm

LEED for HOMES: Threshold adjustment

LEED for Homes (LEED-H) Forum
posted by  Roberto Chauriye  on 

Can someone explain me step by step how I apply the THRESHOLD ADJUSTMENT formula? Are there any missing parenthesis in the formula that apperas in the guide? thanks in advanced, Roberto.

1
Sat Dec 29, 2012, 1:28 am