Forum quick links
Calculating material costs in MRc4 and MRc5
NC-2009 MRc4:Recycled Contentposted by Alexander Aaltonen on
I have similar concerns as Maria described earlier, and I would really appreciate some advice on how to calculate material costs in a case where a sub-contractor is performing concrete works on-sit
Greenhouse
Schools-2009 EAc1:Optimize Energy Performanceposted by Lisa Logan on
Client is adding greenhouse to the school project - sort of late in the game. Does this space get included in our energy calcs? I am assuming yes and that there is no way around it.
Signage Details?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Marketing Coordinator on
Hi, I'm working on a LEED 2009 for Schools project and just rec'd my Design review comments.
Tenant Layout
CS-2009 IEQp1:Minimum IAQ Performanceposted by Dan Forino on
For our LEED CSv2.0 project, we have been asked to provide a proposed tenant layout for approximately 6 office spaces.
what happens when verification turns up changes?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Tristan Roberts on
It's a requirement for EAp1 that the CxA verify the installation and performance of systems to be commissioned.
Permeable or Mulched Paths in Calculations
NC-2009 WEc1:Water Efficient Landscapingposted by Terry Gorski on
How would permeable or mulched paths be shown in the LEED Online form calculations? Would they still be considered landscaping, and not irrigated, and left in the calculations?
Non Potable Municiply Provided Well Water
NC-2009 WEc1:Water Efficient Landscapingposted by Sam Keehn on
There is municiply provided water available, called raw water which, as per the standard has less than 5,000 mg/l of Total Disolved Solids.
ASHRAE 62.1 MZ calculator acceptable alternative documentation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Courtney Yan on
We are working on fixing the built-in calculator for IEQp1/c2.