NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Raina Tilden on
Hi! My project is a large building hosuing a combination of diverse spaces -- office/conference/industrial/lab.
Showers in retail project
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Ourana Cacho on
My small (
Daily uses public vs. private in hotel
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jens Apel on
I am working on a hotel NC certification. It is clear that the guests count as residents with 5 uses per day for toilets and faucets. But there is a public toilet block next to the breakfast room.
Periodic testing
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Albert Sagrera on
What time interval should be between each measuring on air speed and radiant temperature?
Project Boundary for Shared Parking
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by yanghee pierce on
I am working on a new construction of a hospital building on a site where a new MOB and a shared parking garage will be also constructed.
MRc2 100% diversions
NC-2009 MRc2:Construction Waste Managementposted by Marcio Alberto Casado Pereira on
Our Project got 100% diversion. This was a result of a very hard work implemented by the builder, the owner and the entire costruction team.
Pine tree- Rapidly renewable
NC-2009 MRc6:Rapidly Renewable Materialsposted by Lavanya Veerappa on
Hi, One of our project has used Pine trees for manufacturing office furnitures. Can we consider pine tree as a rapidly renewable material ? Please suggest
Remanufactured Materials/Regional
NC-2009 MRc3:Materials Reuseposted by Farah A. on
-Does a re-manufactured product count in Materials Reuse?
Modelling Baseline Envelope for Existing + Additions
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Dear forum users, I have modelled a project following Appendix G.
UPS equipments for energy star
CI-2009 EAp2:Minimum Energy Performanceposted by Nandana Kumar on
Hi, Is it mandatory that Uninterrupted Power Supply (UPS) which is installed in the project space is also Energy Star Rate?