Non-certified buildings in LEED boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  marty seese  on 

I have a project that is all new construction. There are 3 buildings on the site. The main building which is what the owner wants to be LEED Certified. Another building is a shed building.

3
Wed Apr 27, 2022, 7:04 pm

NC & CI projects

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Sheryl Swartzle  on 

I found the purchasing process for Water Restoration Certificates to be very easy with BEF.  The benefits are easily understood by the clients and on our CI project the cost was very reas

2
Default Avatar
Sustainability Consultant
Steven Winter Associates
LEEDuser Premium Member
0 thumbs up
Wed Apr 27, 2022, 4:31 pm

HVAC Background Noise - sound rating methods

NC-v4.1 EQc9:Acoustic Performance
posted by  Iris Meeker  on 

For the HVAC Background Noise, do all spaces have to use the same Sound Rating Method (NC/RC, dBA, dBC, RC(N)), or can these vary by individual space or by space type?

1
Mon Mar 10, 2025, 2:33 pm

Interpretation of text relating to Envelope

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Keith Fahy  on 

Hi, see here an extract from the Reference Guide: "The envelope must be covered in the OPR and BOD, but full envelope commissioning is not required unless the project team pur

0

Disinfectants with EPA Registration No. and on List N: Disinfectants for Coronavirus (COVID-19)

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  DINGTIAN OU  on 

Few green disinfectants (e.g. Green Seel, UL or EPA Safer Choice Standard certified) are available in Hong Kong market.

Our clients proposed two commonly used disinfectants:

1
Mon May 2, 2022, 7:20 pm
1
Fri May 13, 2022, 10:26 pm

District cooling chilled water

CS-v4 WEc2:Indoor water use reduction
posted by  Dina El-Sady  on 

If the project is served by a district cooling plant outside LEED project boundary , does the chilled water count as process water and needs to be included in water efficiency calculations?

1
Fri May 13, 2022, 11:32 pm
2
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Wed Apr 27, 2022, 12:05 am

WEpc115 & CBECS data

Pilot-Credits WEpc115:Whole Project Water Use Reduction
posted by  Steve Loppnow  on 

We found that CBECS data was more conservative than the metered water use for kitchen areas from comp projects in the portfolio.

1
Fri Oct 14, 2022, 9:22 pm

All-Gender Restrooms - Verticality (Locate on all levels or selected levels?)

NC-v4 INc1:Innovation
posted by  Vijitha Mammen  on 

We are working on a post-secondary education project incorporating both gendered and all-gender restrooms.

0