Forum quick links
Fire-stopping sealant
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Joanna Bloniewska on
How would you qualify fire-stopping sealants? What VOC limit would you apply? I can't find it in SCAQMD rule 1168.
What exactly is a medical furnishing?
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
The items below are for OR's, Scub Rooms, Corridors, Storage Room. Do the following count as medical furnishings or equipment?
Gross Project Square Footage
NC-2009 PIf2:Project Summary Detailsposted by Catherine Blakemore on
When we registered one of our healthcare projects we entered it with a gross project square footage of 14,300. Under the LEED project, the 2nd floor will just a floor and shell, with no finishes o
MR Credits - Building product disclosure and optimization
posted by Melissa Wrolstad on
Questions: For the BD+C Building product disclosure and optimization MR credits (MRc2, MRcr3, MRcr4), can someone please clarify: 1.) Between the three credits, are there 6 or 7 points available?
ID&C - EApr1 - preventing ID&C projects from achieving LEED?
posted by Melissa Wrolstad on
To achieve the ID&C EApr1 – Fundamental commissioning and verification, per version 6 of the LEEDv4 draft of this prerequisite a project team must “prepare and maintain a current facilities req
asbestos roof
posted by Tristan Roberts on
No, LEED does not have specific requirements such as replacing certain kinds of roofing.
Gray area of commingled vs on-site sorting
NC-2009 MRc2:Construction Waste Managementposted by Stantec IP - Dupe - Do not use on
During a demo of an existing building, many items were sorted onsite and sent to a specific recycler.
Connection to Project Boundary
ND-v2009 NPDp3:Connected and open communityposted by Bernard Sagaiyaraj on
This is relating to NPDp3 and NPDc6. I have a project with 4 motorized street connections to the project boundary and 2 pedestrian walkways (stairways) to the project boundary.
Parking Garage & Office/Hangar Buildings
posted by S D on
We have two projects on one site, a parking garage (not a LEED project) and an Office/Hangar which will be submitted for LEED certification (registered under v2.2).
Old refrigeration equipments in new construction.
NC-2009 EAc4:Enhanced Refrigerant Managementposted by James Chueh on
Hi all, The project we are working on will have old refrigeration equipments moved from other place.