Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ISO 50001 ACP Timeframe

EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by  Gina Dederer  on 

Our project has completed a full ISO 50001 certification last year and is not due for a renewal until 2018.

3
Default Avatar
URS Deutschland GmbH
LEEDuser Basic Member
3 thumbs up
Tue Apr 26, 2016, 12:40 pm

District Energy System Guidance, Option 1

NC-2009 EAp2:Minimum energy performance
posted by  Santiago Rodriguez  on 

Hello, I am modeling a district cooling system, since the HVAC system serves three buildings, including the one that is seeking LEED Certification.

3
Tue Apr 26, 2016, 12:17 pm

Calculation based on chilled water meters

Retail-CI-v2009 EAc5:On-site renewable energy
posted by  Maria Isabel Conde  on 

Our comercial interior project is located in a building that has photovoltaic panels that feed the central chilled water plant. We have: 1.

5
Tue Apr 26, 2016, 12:00 am

Additional floors of existing building

NC-2009 EAp2:Minimum energy performance
posted by  Jatuwat Varodompun  on 

Our project is the major renovation of an existing building. We have added 2 new floors on the top. 1.

8
Default Avatar
ME Engineers Inc.
LEEDuser Basic Member
17 thumbs up
Mon Apr 25, 2016, 8:44 pm

Performance period and construction

EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterations
posted by  Kasandra Martin  on 

Our project is in the process of building an addition. The performance period is not yet started.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Apr 25, 2016, 8:41 pm

Exemplary Performance?

CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  José Solis  on 

The BD+C Reference manual states: "This credit is not eligible for exemplary performance under the Innovation in Design section." However, a response from Tristan Roberts on June 4, 2010 states th

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Mon Apr 25, 2016, 6:47 pm

Room Input Report

NC-2009 IEQc7.1:Thermal comfort - design
posted by  Bill Friedl  on 

I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space type.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Apr 25, 2016, 6:12 pm

DES Condenser Water System

NC-2009 EAp2:Minimum energy performance
posted by  Jake Torok  on 

We're working on a small project (7,500 SF) pursuing LEED NC v2009 designed with water-source VRFs served by a shared central condenser water system with cooling towers, boilers, and pumping.

4
Mon Apr 25, 2016, 4:39 pm

Implementing all improvements in one renovations phase at a time

EBOM-2009 EAc2.2:Existing building commissioning - implementation
posted by  Melissa Merryweather  on 

We're starting the audits for an EBOM project that is a university building.

3
Mon Apr 25, 2016, 4:17 pm

CxA selection

EBOM-2009 EAc2.3:Existing building commissioning - ongoing commissioning
posted by  Melissa Merryweather  on 

In LEED NC there are explicit instructions as to whom is eligible to be the projects' CxA. I don't see reference to this in LEED EBOM.

3
Mon Apr 25, 2016, 4:08 pm