Forum quick links
ENERGY MODELING
CS-2009 EAp2:Minimum energy performanceposted by RICARDO GUEMEZ DIAZ on
Hello, In Mexico City we have a one project that is integrated in two phases, the phase one start the construction phase in 2011 and the second phase will start the construction phase the next year
Cx and contractors
CS-2009 EAp1:Fundamental commissioning of building energy systemsposted by Jean-Baptiste Noel on
Hi all, Our current project is a Design & Build, for which the MEP contractors are required to hire a third party to commission their systems (so each MEP will probably have a different compan
Exterior Corridor
NC-2009 PIf3:Occupant and Usage Dataposted by Ema S on
We are working on a school building, the second floor contains an exterior corridor that cotains roof overhang.
LPD for data center space type
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Keith Amann on
I received comments back from a reviewer that data center/server rooms should be classified as "active storage" with 0.8 W/sf allowance.
PIf4 Overview Documents Uploading
NC-2009 PIf4:Schedule and Overview Documentsposted by Giancarlo Perossa on
Someone else posted the following (which I'm having trouble with, as well) elsewhere on leeduser: "I’m not sure I am successfully uploading pdf files on PIf4 at “Overview Documents”.
Existing Transit
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Amanda Tullos on
Can someone please clarify, for infill projects under 125 acres with existing transit, does the project require access to multiple transit types? The credit language seems to request this.
Responsible party for preparing M&V plan
NC-2009 EAc5:Measurement and verificationposted by Becky Dix on
What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?
Can LEED interpretations be enforced on older LEED versions?
posted by Sandra Bauder on
It is my understanding, that though one can choose to quote a CIR for equal treatment under a specific credit, CIR's do not constitute a formal part of a credit requirement. Specifically, we are pu
Controller efficiency factor (CE)
NC-2009 WEc1:Water efficient landscapingposted by Ricardo Sá on
During a certification process I have found an electronic irrigation controller (model Hunter Pro-C) that is equipped also with a rain sensor (model Hunter Rain-Click).
ND standard vs the NC standard
ND-v2009 GIBp4:Construction activity pollution preventionposted by Amanda Tullos on
Any idea how the 2003 EPA Construction General Permit (Phase I and I NPDES) required in LEED-NC compares to the Washing State Department of Ecology's Stormwater Management Manual requirement for th