Topic | Recent |
---|---|
Submetering requeriments for exclusive chiller for tenant spaceCI-2009 EAc3: Measurement and Verificationposted by Maria Isabel Conde on Dec 13, 2017, 4:47 pm
The project is located within a building, its area is less than 75% of the total area of the building. The project has a chiller plant that only supplies the project area. Bearing in mind... Last reply: Marcus Sheffer, Dec 15, 2017, 10:21 am |
|
Owns BuildingCI-2009 EAc3: Measurement and Verificationposted by Kristopher Croghan on Mar 17, 2017, 4:01 pm
If a client owns all of the interior space, then I assume that they would obtain this credit, since they pay all of their energy and water bills. Would I be correct? Last reply: Marcus Sheffer, Jul 5, 2017, 12:57 pm |
|
ACP using v4 languageCI-2009 EAc3: Measurement and Verificationposted by Brightworks Sustainability on Oct 5, 2016, 1:38 pm
LI #10418 allows LEED-NC v2009 projects to meeting the M&V credit by meeting LEED v4 enhanced... Last reply: Marcus Sheffer, Oct 5, 2016, 2:40 pm |
|
Water meteringCI-2009 EAc3: Measurement and Verificationposted by Ciaran McCabe on Sep 29, 2016, 2:13 pm
Does the cold water feed to tenant spaces need to be metered for this credit. Cold water consumption does not feature in the energy model. Last reply: Marcus Sheffer, Oct 3, 2016, 10:14 am |
|
LEED-CI without an energy modelCI-2009 EAc3: Measurement and Verificationposted by Brightworks Sustainability on Sep 27, 2016, 12:34 pm
I'm working on a LEED-CI project occupying 100% of the tenant space. The project is complying with appropriate zoning and controls for EAc1.3 and therefore not doing an energy model, making them... Last reply: Marcus Sheffer, Sep 27, 2016, 2:02 pm |
|
Third-Party Energy Reporting Innovation CreditCI-2009 EAc3: Measurement and Verificationposted by Garrett Ferguson on Aug 24, 2016, 12:29 pm
Does anyone know if the Exemplary Performance option for BD+C given for sharing energy data via a Third-party template is available for ID+C? I haven't seen anything about it either way. ... Last reply: Garrett Ferguson, Aug 25, 2016, 9:53 am |
|
Sustainability dashboard instead of sub-meter?CI-2009 EAc3: Measurement and Verificationposted by Crista Shopis on Mar 25, 2014, 3:04 pm
I am trying to think through an alternative compliance. Please humor me. Last reply: Christopher Schaffner, Jun 15, 2016, 11:01 am |
|
Tenant Sub-MeteringCI-2009 EAc3: Measurement and Verificationposted by Donald Green on May 11, 2016, 2:42 pm
Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space. They will not however pay their electrical bill directly they will have a... Last reply: Michael Smithing, May 11, 2016, 10:41 pm |
|
Case 1 vs Case 2CI-2009 EAc3: Measurement and Verificationposted by Brightworks Sustainability on Apr 6, 2016, 1:37 pm
Our TI project is 4 floors of a large building, so Last reply: Marcus Sheffer, Apr 12, 2016, 9:59 am |
|
submetering general requirements and strategy for metering HVACCI-2009 EAc3: Measurement and Verificationposted by Rob Pinkston on Mar 28, 2016, 4:12 pm
Hello, Last reply: Rob Pinkston, Mar 29, 2016, 11:08 am |