Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
4
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Wed May 11, 2011, 1:58 pm

specific mechanical drawings for PI4?

General forums
posted by  Erica Downs  on 

Does anyone know specifically which "mechanical" drawings GBCI is looking for here? We have 26 drawings just for mechanical (not including electrical or plumbing).

5
Wed May 11, 2011, 1:12 pm

Remnant Limestone- any LEED credit there?

CS-2009 MRc3:Materials Reuse
posted by  Julie Hendricks  on 

My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Tue May 10, 2011, 1:29 pm

Occupancy Sensor

CI-2009 EAp2:Minimum Energy Performance
posted by  Simon Sue  on 

We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors).

3
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Tue May 10, 2011, 12:23 pm
5
Tue May 10, 2011, 11:51 am

EAPr2 - Lighting Control (shut-off control and space control)

CI-2009 EAp2:Minimum Energy Performance
posted by  Ramesh Narayanan  on 

Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory p

2
Energy Engineer
CLEAResult Consulting
LEEDuser Basic Member
222 thumbs up
Tue May 10, 2011, 7:12 am
4
Default Avatar
Project Manager
KGO Consultants
LEEDuser Basic Member
19 thumbs up
Fri May 6, 2011, 6:10 pm

Interpretation table 5.5-4 ASHRAE 2007 mandatory provisions

NC-2009 EAp2:Minimum Energy Performance
posted by  Vindio Corro  on 

We are preparing the LEEd for a Stadium in Spain and I have a doubt with the conditioned areas. The level -2 is conditioned and the level -1 (parking) is unconditioned...which is the U-factor we ha

4
Default Avatar
Master Degree Construction Engineering
Anomalia
LEEDuser Basic Member
11 thumbs up
Fri May 6, 2011, 1:35 pm

LEED CS & LEED CI - PV array

CS-2009 EAc1:Optimize Energy Performance
posted by  S. Sachs  on 

Hi, I am working on a LEED CS project, at the same time the tenant is pursuing LEED CI (separate submission) and planning to install a PV array to achieve the 2.5% of building electricty required

3
Default Avatar
(old inactive account)
LEEDuser Basic Member
12 thumbs up
Thu May 5, 2011, 8:27 pm

Estimated crown diameter

Pilot-Credits PC14:Walkable Streets
posted by  Christina Lynch  on 

Does anyone have a good resource for or way of calculating a tree's estimated crown diameter? (Benchmark "m" for NC/CS or "f" for Schools). Thanks!

3
Default Avatar
Atkins
LEEDuser Basic Member
7 thumbs up
Thu May 5, 2011, 7:44 pm