Energy Recovery in baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
G3.1.2.10 says ER is needed when design cfm >5000 and more than 70% OA. I wonder does this mean the proposed or baseline design cfm? Our proposed design uses chilled-beam w/100% OA in the DOAS.
Power Line Overhead?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Cindy Quinn on
Our LEED boundary has a power line easement running through it. The city's zoning doesn't allow development in this area.
Denial of EA PR2
NC-2009 EAp2:Minimum Energy Performanceposted by Roxanne Button on
A client has asked for my advice in appealing the denial of PR2. I've taken a quick look at the review comments but will be digging deeper into it in the next couple of days.
Library stacks
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Andrew Hruby on
First off I have a slight confusion about whether library stacks should be considered non regularly occupied area or a regularly occupied area with movable furniture.
Permanent Land /Space Requirement (MPRPp2)
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by al-emran hossain on
Hi LEED Expert , We want to know about Minimum Program Requirement (MPRPp2)of permanent space/land matter. Our client has 20 years lease land from BD Gov and build NC factory as a LEED Project .
Used Furniture with Recycled Content
CI-2009 MRc4:Recycled Contentposted by Kristine Byers on
Our project is a TI which includes the renovation of several floors of a corporate office building. The tenant is bringing with them a substantial amount of used furniture.
GreenWizard
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alyssa Schear on
Did GreenWizard cease to exist? I keep getting an error when I go to their webpage?
Combine Natural ventilation & trickle ventilation for Apartment
NC-2009 IEQp1:Minimum IAQ Performanceposted by Thu Nguyen on
Dear all experts! I have a high-rise residential building which aim to comply with IEQ pre.1 by combining 2 ways. 1.
Enhance Cx, 10 month review of building operation
NC-2009 EAc3:Enhanced Commissioningposted by Laura Howe on
Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?
Rainfall over landscape areas
EBOM-2009 WEc3:Water Efficient Landscapingposted by Rubén M. R. on
Would it be valid to claim 50% potable water reduction for irrigation if I have a landscape area that requires X galons of irrigation during the month of July (according to the LEED form) and I can