Forum quick links
Existing Buildings
Pilot-Credits EQpc78:Design for active occupantsposted by Rubén M. R. on
This pilot credit is an incentive for existing building owners to plan a renovation of unused stairs.
Pump Performance
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ciaran McCabe on
Hi, We have 2 number domestic hot water return pumps (100 watts each). These are the only two pumps we are specifying within the scope of this fit-out.
SS 7.2 (v2009 C+S) -- Tenant Improvements to Roof
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Justin Oldfield on
Our core and shell project has chosen a roofing material compliant with SS 7.2.
Prescriptive Method of Documenting - Floor Area (per bay)
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Michael Haugh on
First off, I have had a very hard time finding information to help complete this Credit's documentation.
How to model electric wall heaters in PRM energy model
NC-2009 EAp2:Minimum Energy Performanceposted by Veronica Reed on
Hello, We are renovating a 1905 two-story small historical landmark building as a 12 room boutique hotel, thus cannot include HVAC systems due to planning and preservation restrictions, and the lo
Calibrated vs actual energy use
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Puteri Shireen Jahnkassim on
Dear all, What if the case is that the actual total energy use diverted only around 1 to 3 percent of the predicted energy during design? Is a calibrated energy simulation model still need by LEE
pc14 for Historic School building in urban context
Pilot-Credits PC14:Walkable Streetsposted by Kristian Whitsett on
We were inspired to test out this credit because of the huge increase in students walking to school after we completed a full renovation of a historic school in North Adams, MA.
Reuse roof joists But not roof deck
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by C. Anne Brockelman on
I am working on a renovation project of a courthouse. We will be reusing the roof joists but will remove all the existing roof deck.
Fresh air supply using Cooling pad in Production area
NC-2009 IEQp1:Minimum IAQ Performanceposted by SAMY Chamy on
Dear all Our project is single storied sewing factory in production area we have large size Exhaust fans in one side and opposite side of exhaust fan have cooling pad Now the issue is we can't p
Renewable Energy Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Our project have boiler (Rice husk fired boiler) we buy the Rice husk from nearest stores for boiler The boiler gives 500 kg/hr steam can we count this boiler energy as renewable energy can w