Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Kitchen Supply AHU (For Make Up Air)

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Ciaran McCabe  on 

As part of a fit out I the only tenant AHU is for make up air in a Kitchen 2966.4 CFM Can anyone explain the approach to enter this is in LEED form.

0

Energy Recovery (G3.1.2.10)

CS-2009 EAp2:Minimum Energy Performance
posted by  Andy Fouss  on 

The proposed building is a dormitory served using individual fan coils (with no outside air in the fan coils) and the outside air for the building being supplied by a single dedicated outside air u

1
Mon Jan 11, 2016, 9:08 pm

Custom Walk-In Freezers and Refrigerators

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  David Hryvniak  on 

I am working on a project with commercial food service equipment. The equipment includes a few custom walk-in freezers and coolers.

1
Fri Jan 8, 2016, 10:08 pm

can hotels be included as 10 unit per acre requirement

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Rob Hink  on 

I'm working on a very suburban site and was wondering if I can include a hotel as part of the minimum 10 unit per acre requirement?

1
Tue Jan 12, 2016, 7:22 pm

net area vs gross area (simulation)

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Panagiota Dadinou  on 

Hello, a question concerning IEQc8.1 & IEQc8.2 . Can we use the net floor area instead of gross floor area for the simulation in Matrix_Table IEQ-1 Daylight and views? I would like to use t

0

Emergency Lighting within Daylight Zone

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  William Weaver  on 

I have a scenario where the core is offset, and is tight to the building envelope on one side. As a result, the egress path around the core on this side falls within the 15' perimeter.

1
Tue Mar 22, 2016, 9:40 pm

Total Site Areas

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Dave L  on 

Hi, I am working with a project that is beneath a municipal park.

0

Oriented Strand Board - OSB

CI-2009 MRc6:Rapidly Renewable Materials
posted by  Lorenna Lobo  on 

Hi, is the oriented strand board - osb considered as rapidly renewable?

1
Wed Jan 13, 2016, 2:37 pm

Industrial facility in ASHRAE 90.1 2010

NC-v4 EAp2:Minimum energy performance
posted by  Richard Bartlett  on 

We are designing a research and development facility for an equipment manufacturer and trying to pursue LEED certification for the facility.

1
Wed Jan 13, 2016, 4:20 pm

MRp1 Can a designated dumpster serve as my area of recycling?

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Shelly Christman   on 

Hello All, We have a 140,000 SF shell & Core project that is mixed use 1st floor and office space floors 2-6. We are using LEED 2009 C&S.

1
Wed Jan 27, 2016, 6:06 pm