Forum quick links
Kitchen Supply AHU (For Make Up Air)
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ciaran McCabe on
As part of a fit out I the only tenant AHU is for make up air in a Kitchen 2966.4 CFM Can anyone explain the approach to enter this is in LEED form.
Energy Recovery (G3.1.2.10)
CS-2009 EAp2:Minimum Energy Performanceposted by Andy Fouss on
The proposed building is a dormitory served using individual fan coils (with no outside air in the fan coils) and the outside air for the building being supplied by a single dedicated outside air u
Custom Walk-In Freezers and Refrigerators
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by David Hryvniak on
I am working on a project with commercial food service equipment. The equipment includes a few custom walk-in freezers and coolers.
can hotels be included as 10 unit per acre requirement
NC-2009 SSc2:Development Density and Community Connectivityposted by Rob Hink on
I'm working on a very suburban site and was wondering if I can include a hotel as part of the minimum 10 unit per acre requirement?
net area vs gross area (simulation)
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Panagiota Dadinou on
Hello, a question concerning IEQc8.1 & IEQc8.2 . Can we use the net floor area instead of gross floor area for the simulation in Matrix_Table IEQ-1 Daylight and views? I would like to use t
Emergency Lighting within Daylight Zone
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by William Weaver on
I have a scenario where the core is offset, and is tight to the building envelope on one side. As a result, the egress path around the core on this side falls within the 15' perimeter.
Total Site Areas
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Dave L on
Hi, I am working with a project that is beneath a municipal park.
Oriented Strand Board - OSB
CI-2009 MRc6:Rapidly Renewable Materialsposted by Lorenna Lobo on
Hi, is the oriented strand board - osb considered as rapidly renewable?
Industrial facility in ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Bartlett on
We are designing a research and development facility for an equipment manufacturer and trying to pursue LEED certification for the facility.
MRp1 Can a designated dumpster serve as my area of recycling?
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Shelly Christman on
Hello All, We have a 140,000 SF shell & Core project that is mixed use 1st floor and office space floors 2-6. We are using LEED 2009 C&S.