Glass in Jalousie-style

NC-2009 EAp2:Minimum Energy Performance
posted by  James Lee  on 

Hi, Is there specially I have to concern when I define the fenestration's properties for jalousie-style glass in energy modeling? Thanks in advance

7
Wed May 24, 2017, 6:01 pm

Cold Shell compliance path

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Brightworks Sustainability  on 

Hi all, I'm working on a cold dark shell project where the owner is NOT building out any HVAC systems (only plumbing); the tenant will install everything.

2
Wed May 24, 2017, 1:10 am

Operable windows

NC-v4 EQc5:Thermal comfort
posted by  Charalampos Giannikopoulos  on 

For an open-plan office space with individual working spaces the project team has used operable windows in order to provide thermal comfort control.

6
Tue May 23, 2017, 7:36 pm

Which Standard to use?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  RYAN BEN SABILALA  on 

A WELL certification will be pursued and the project was registered to LEED v2009. IEQ Prerequisite 1 Option 1 will be in line with ASHRAE 62.1-2007.

2
Tue May 23, 2017, 6:18 pm

Option 2 "reduction below industry average"

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Jennifer Rinkus  on 

For option 2 it states the products must demonstrate impact reduction below industry average in at least 3 categories. Where do I find those "industry averages" to know if my products qualify?

5
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Mon May 22, 2017, 4:08 pm

Projects with Several Physically Distinct Structures

NC-v4 MPR3:Must comply with project size requirements
posted by  Inés Alomar  on 

We are starting with the process of certifying a project under v4 for BD+C. It is a hotel with a main building with a main building of 5,000 square meters plus 2 additional small buildings of 1.000

2
Default Avatar
LEED AP BD+C
MZ and Partners
LEEDuser Basic Member
0 thumbs up
Sun May 21, 2017, 11:33 am

Project boundary dilemma: City stormwater permit vs LEED area

NC-2009 PIf2:Project Summary Details
posted by  Craig Wilson  on 

Hi! Our site is located in Minneapolis and is a rather complex historic urban infill site. Three quarters of a former industrial site's entire city block was redeveloped by our client.

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri May 19, 2017, 10:07 pm

Occupancy Levels for C&S Buildings

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Ciaran McCabe  on 

I received the following comment from a LEED reviewer; "The LEED Form states that the project is mechanically ventilated and that the ventilation system has met the minimum requirements of ASHRAE

2
Energy Analyst & Energy Systems Design Engineer
HKS
LEEDuser Expert
7 thumbs up
Fri May 19, 2017, 5:26 pm

mandatory provisions for systems that are not in scope of work

CS-v4 EAp2:Minimum energy performance
posted by  Alessandro Speccher  on 

hi all, we are doing a feasibility study on a CS major renovation project located in South Italy.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 18, 2017, 2:44 pm

Is compliant SRI paint enough?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Raymond Salfiti  on 

Hello, We were under the impression that painting 100% of our roof areas with SRI tested compliant paint in accordance with the manufacturer technical instructions would meet the requirements of c

5
Default Avatar
Senior Sustainability Manager
UL Solutions
LEEDuser Premium Member
7 thumbs up
Thu May 18, 2017, 2:36 pm