Forum quick links
Baseline System Type
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Nikos Tsitsikas on
Hi all,
Correctional Facility lighting
NC-v4 SSc6:Light pollution reductionposted by Lawrence Rennell on
Government mandated roadway lighting is exempted from light pollution reduction calculations. What about correctional facilities?
New Wall Project - LEED Applicability
posted by Amgad Khattab on
Is it applicable for a historic wall project to obtain LEED New Construction BD+C Certification?
Entire building vs tenant space recyclables collection
CI-v4.1 MRp1:Storage and Collection of Recyclablesposted by Neumann Monson on
The credit language says the project needs to provide dedicated areas for collection and storage for the "entire building". If a project is a tenant space within a larger existing mixed use b
EPDs for slag and Portland cement in multiple concrete mixes
NC-v4.1 MRc2:Environmental Product Declarationsposted by Linda Davisson on
Our Project Team would like to confirm if EPDs can be listed in the MR Calculator multiple times for slag and Portland Cement when used in multiple concrete mixes with different
Commercial refrigeration systems but not a store
EBOM-v4.1 EAc1:Enhanced Refrigerant Managementposted by Summer Minchew on
I have an O+M project considering Option 2.
CRI Green Label Plus-Low Emitting Materials
posted by Bob Paterson on
Looking to confirm if CRI Green Label Plus remains as eligibility for a point in Low emitting materials strategy for V4.1?
School- Combination Oven (p2 et credit)
Schools-NC-v4 WEp2:Indoor water use reductionposted by Priscillia Champagne on
Hi LeedUser, My supplier specialist asked me 2 questions on Combination Oven :
Discrepancy material price from budget and actual cost
NC-2009 MRc4:Recycled Contentposted by Charline SEYTIER on
We used the budget method for all divisions concerned to calculate the total material cost and we are now using the actual cost for the big tickets items to achieve our objectives. On some items, w