Blower Door Testing in non-smoking rooms

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Emmanuel Pauwels on Feb 4, 2014, 5:49 am

In our hotel project, most rooms are non-smoking. Do they comply or do we have to test on all rooms even when they are designated as non smoking?

Last reply: Hannah Bronfman, Feb 17, 2014, 1:36 pm

Underground Parking Garage and Loading Dock

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Elizabeth Felder on Nov 21, 2013, 9:25 pm

What is the consensus on entryways from an underground parking garage into the building? Would signage need to be posted at the doors into the building from the garage area? What about level 1...

Last reply: Jason Franken, Jan 2, 2014, 4:39 pm

Smoking 25 feet from operable windows

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Anna Dengler on Dec 18, 2013, 4:29 pm

Our building has a no smoking policy and will be posting no smoking signage at all entrances "No smoking within 25 feet of building entrance." However, the windows on the second floor are...

Last reply: Barry Giles, Dec 23, 2013, 1:00 pm

Differential Pressure Test

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Michael Smithing on Aug 8, 2013, 6:25 am

We've conducted the differential pressure test and the average is around 7 pa.

We've had the contractor test the room and report the results on the LEEDUser form. The form has a space...

Last reply: Tristan Roberts, Nov 4, 2013, 10:29 pm

Smoking shelters

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Julie Pollack on Oct 23, 2013, 12:54 pm

When researching this credit, I found info stating that when using Option 1, the building owner should provide a smoking shelter. Is this true? I've not found any other references to this...

Last reply: Tristan Roberts, Oct 23, 2013, 2:14 pm

Zero Lot Line Buildings

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Andy Rhoades on Jul 8, 2013, 12:36 pm

For those of you working with zero lot line buildings: we have seen the reviews vary in the past pertaining to documentation submittals. We have decided to clarify this by using an "unofficial"...

E Cigarettes

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Robin Obaugh on Jun 19, 2013, 10:54 am

Has there been any commentary on whether how "e-cigarettes" align or do not align with the intent of this credit?

Last reply: Andy Rhoades, Jul 8, 2013, 12:33 pm

EQp2 Residential Buildings that Allow Smoking Testing

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Joanne Sawatzky on Dec 10, 2012, 11:58 am

Wondering the testing requirements (blower door) for residential buildings that allow smoking in the suites. Do we have to test every suite or just 10% of the first x and 5% of the remaining x...

Last reply: Michelle Raigosa, May 29, 2013, 9:11 pm

Blower Door Testing on 36 Story Multi-Family

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Rachel Shepherd on May 8, 2013, 4:04 pm

I am working on a project where blower door testing is required for a multi-family facility. The building is 36 stories tall with a mechanical penthouse. The...

Last reply: Michael Smithing, May 8, 2013, 4:33 pm

Entries- Definition

EBOM-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Mario Kranzl on May 14, 2012, 8:13 am

"Prohibit on-property smoking within 25 feet of ENTRIES, outdoor air intakes and operable windows."

I didn't found a definition, which entries are meant? Perhaps main entries for building...